The first object to be accomplished, with the assistance of the
Light-house Yacht, was to get the floating-light secured at her new
station, an operation which required the finest of weather. To-day, the
wind was at NE., and although moderate, it was, of all others, most
dreaded at the Bell Rock, the heavy gale of the 6th instant having
been from this direction. The writer, however, judged it advisable to
proceed with the laying down of the new moorings, and in case of any
accident by the slipping of the chain, as formerly, the artificers,
instead of going to the rock this tide, were kept on board, that the
seamen and all hands might be on the spot to render assistance. These
new moorings consisted of 40 fathoms of chain, made from iron-bars of
one inch square, with a cast-iron mushroom-anchor, weighing 1 ton 1
cwt. 2 qrs. 4 lb. This anchor and chain, were let down in a depth of
twenty-one fathoms, the Bell Rock being from the new station SE. ½
S., distant two and a half miles; Redhead N. by E., distant ten miles;
Arbroath N.NW., distant about ten miles; Fifeness SW. by W., distant
about eleven miles, and Isle of May SW. by S., distant sixteen miles.
The moorings having been laid down on this spot, a buoy was placed upon
them. The Yacht then took the floating-light in tow to her new station,
where she was made fast to the chain, with a new cable measuring
sixteen inches in circumference. This business was successfully
accomplished at about 2 o’clock P. M., after six hours of very hard
work.
The first cables of the floating-light were of patent cordage, made of
the very best materials, and most beautifully laid by machinery. But
the sailors complained that these ropes were so stiff and unpliable,
that they could neither be got stowed in the hold, nor run freely out
of the hause-holes. These difficulties were also more felt with the
patent laid cables, after the weather became somewhat cold. It was,
therefore, found necessary to get a new cable, laid in the ordinary
way, for the winter months.
[Sidenote: Smeaton arrives with the beams of the Beacon in tow.]
Another important occurrence, connected with the operations of this
season, was the arrival of the Smeaton at 4 P. M., having in tow
the six principal beams of the Beacon-house, together with all the
stanchions and other work on board for fixing it on the rock. The
mooring of the floating-light was a great point gained, but, in
the erection of the beacon at this late period of the season, new
difficulties presented themselves. The success of such an undertaking,
at any season, was precarious; because a single day of bad weather
occurring, before the necessary fixtures could be made, might sweep
the whole apparatus from the rock. Notwithstanding these difficulties,
the writer had determined to make the trial, although he could almost
have wished, upon looking at the state of the clouds, and the direction
of the wind, that the apparatus for the beacon had been still in the
work-yard.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account