The wind this morning was variable, but the weather continued extremely
favourable for the operations throughout the whole day. At 6 A. M.
the boats were in motion, and the raft, consisting of four of the six
principal beams of the Beacon-house, each measuring about sixteen
inches square, and fifty feet in length, was towed to the rock, where
it was anchored, that it might _ground_ upon it as the water ebbed. At
7 A. M. the boats of the Floating-light, the Yacht, and the Smeaton,
arrived at the rock, when the work immediately commenced. The sailors
and artificers, including all hands to-day, counted no fewer than
fifty-two, being perhaps the greatest number of persons ever collected
upon the Bell Rock. It was early in the tide when the boats reached
the rock, and the men worked a considerable time up to their middle
in water, every one being more eager than his neighbour to be useful.
Even the four artificers, who had hitherto declined working on Sunday,
were to-day most zealous in their exertions; they had indeed become so
convinced of the precarious nature and necessity of the work, that they
never afterwards absented themselves from the rock on Sunday, when a
landing was practicable.
[Sidenote: Method of raising the principal beams of the Beacon-house.]
Having made fast a piece of very good new line, at about two thirds
from the lower end of one of the beams, the purchase-tackle of the
derrick was hooked into the turns of the line, and it was speedily
raised, by the number of men on the rock, and the power of the winch
tackle. When this log was lifted to a sufficient height, its foot,
or lower end, was _stepped_ into the spot which had been previously
prepared for it. Two of the great iron stanchions were then set into
their respective holes, on each side of the beam, when a rope was
passed round them and the beam, to prevent it from slipping, till it
could be more permanently fixed. The derrick or upright spar used
for carrying the tackle to raise the first beam, was placed in such
a position as to become useful for supporting the upper end of it,
which now became, in its turn, the prop of the tackle for raising the
second beam, which was laid in such a position, that when hoisted up,
its foot slipped into its place, when it was, in like manner, lashed
to its great iron stanchions on each side. The first and second beams
being lashed to one another at the top, served as a pair of sheers,
from which the purchase tackle was now suspended, for raising the
other two beams, which were also speedily got into their places. The
whole difficulty of this operation was in the raising and propping
of the first beam, which became a convenient derrick for raising the
second, these again a pair of sheers for lifting the third, and the
sheers a triangle for raising the fourth. Having thus got four of the
six principal beams set on end, it required a considerable degree of
trouble to get their upper ends to fit. Here they formed the apex of a
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account