The several departments of the Bell Rock works being arranged for
the winter months, the sloop Smeaton was appointed to make several
trips to the quarries for stones, while the Light-house Yacht, being
stationed at Arbroath, was to attend the Floating-light, and carry off
the artificers to examine the state of the Beacon at spring-tides.
The writer having adjusted these matters, returned to Edinburgh on
the 4th of December. Here he was employed in preparing the necessary
implements, procuring materials, and in other objects connected
with the work, which will fall more properly to be noticed in the
transactions of the year 1808.
CHAPTER IV.
SHIPPING.--IMPLEMENTS.--BUILDING MATERIALS,--AND PROGRESS OF THE BELL
ROCK WORKS IN THE YEAR 1808.
[Sidenote: 1808, January.]
After taking some notice of the preparations made during the
winter months, or early part of the year 1808, it is proposed, in
describing the progress of the works of this season, to adopt the
form of a journal or diary, as in the preceding chapter. The last
year’s operations being more of a preliminary nature, the implements
and apparatus employed were few in number, and simple in their
construction. But the facilities to be afforded by the erection of the
Beacon were such, that not only the site of the building was expected
to be prepared, but it was hoped that some of the courses of masonry
would also be laid during the ensuing summer. It therefore became
necessary to be provided with shipping, and every article, both of
implements and building materials, however small the actual progress of
the work might ultimately be.
_Shipping._
[Sidenote: The New Tender.]
It has already been noticed, in the course of last year’s operations,
that much inconveniency, and no small degree of hazard, were
experienced in making the numerous passages between the Bell Rock
and the Floating-light, especially when the boats were crowded with
artificers. Not having previously been so fully aware of these
circumstances, and with a view to save expence, the Floating-light
was likewise applied to the purpose of a tender. She was consequently
moored at a more considerable distance from the rock, as will be
understood from Plate V.; but as, from the nature of her tackling, she
could not be cast loose upon any emergency, she was found to be but ill
adapted to the uses of a tender.
[Sidenote: Is named The Sir Joseph Banks.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account