The Tender’s bell rung this morning, as the signal for going to the
Rock, at 9 o’clock; and at half-past 9, the water having partially
left the foundation-pit, the work commenced, and continued two and
three-fourth hours, or till a quarter from 1 o’clock P. M., when the
tide again overflowed the whole site of the building. The masons
and seamen returned with the boats on board the Tender, but the
mill-wrights and joiners, who had come off with the Smeaton to fit up
the railways, and such of the masons as were apt to be sick, remained
with the smiths on the Beacon throughout the day.
[Sidenote: General usefulness of Sailors as men of all works.]
The number of workmen at the Rock was now increased to twenty-eight,
including six sailors from the landing-master’s crew, who were
constantly employed in baling water, and keeping the foundation clear
of the chips, struck off by the pick. They also conveyed the irons to
the forge, by hoisting them up to the Beacon by a _whip-tackle_. The
seamen were of the greatest service in many of the operations, for
_Jack_ is a man of all trades; but as they had their boats to attend,
and were always at the landing-master’s call, they were not taken into
account in the enumeration of artificers.
[Sidenote: Mortar Gallery fitted up.]
Mr Francis Watt commenced, at this tide, with five joiners, to fit up
a temporary platform upon the Beacon, about twenty-five feet above
the highest part of the Rock. This platform was to be used as the
site of the smith’s forge, after the Beacon should be fitted up as a
barrack; and here also the mortar was to be mixed and prepared for
the building, and it was accordingly termed the Mortar Gallery. This
platform was supported with joisting, well framed, and properly fixed
to the principal beams; but the flooring or boarding, though two inches
in thickness, was only slightly nailed to the joisting, so that when
the sea rose, and struck it in bad weather, it might lift, without
endangering the general frame of the fabric. At the end of the working
season this floor was lifted, and the joisting only left during the
winter months.
[Sidenote: Smeaton is ballasted at the Bell Rock.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account