The weather having been extremely favourable, regular tides’ work
were got both morning and evening, so that the Second entire course,
containing 136 stones in number, and 152 tons weight, was laid in the
course of seven tides; the sloop Smeaton having been kept constantly
plying between the Bell Rock and Arbroath, where, on her arrival, she
was immediately loaded, whether by night or day. From the favourable
state of the weather, the complete and effective condition of the
landing apparatus, and the dexterity of the landing-master’s crew, a
cargo of stones was discharged from the vessel, and landed on the Rock
in as short a time as the stones could be built, and the holes bored
into the course below, and trenails fixed into them. To facilitate the
lifting of the stones off the waggons, after they were brought on the
railways to the site of the building, and for laying them at once on
every part of its area, though measuring 42 feet in diameter, a second
crane was erected on the First entire course, as represented in Plate
IX., which thus admitted of the Second course being built with great
facility, without once requiring to shift the cranes horizontally;
as the beams, when extended in opposite directions, reached from the
centre to the extremity of the course.
[Sidenote: 1808, September.]
[Sidenote: Second course completed.]
On completing the laying of the Second entire course, the Light-house
began to assume the appearance and form of a building; for, although
still under a part of the excavated rock, it was, nevertheless, 4
feet above the level of the lower bed of the foundation-stone,--a
consideration which was highly gratifying to those immediately
connected with the work. Having successfully completed this course, the
writer sailed with the Smeaton for Arbroath, accompanied by such of the
artificers as had been employed in building, and leaving the Tender
at the Rock, with the mill-wrights, joiners, smiths, and masons, who
worked at the Railways, and in preparing the upper part of the Beacon
as a barrack. After landing at Arbroath, the Smeaton was immediately
dispatched for Aberdeen, in quest of a few blocks of granite, still
much wanted for the courses in hand.
[Sidenote: Friday, 9th.]
[Sidenote: Artificers go off to the Rock. 10 Stones laid.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account