During the month of February, the weather continued to be extremely
boisterous, and it was not without considerable difficulty that the
Floating-light could be visited at the stated periods; while two
unsuccessful attempts were made, on the 1st and 20th, to land at the
Bell Rock.
[Sidenote: Progress of the Works at Arbroath, and exertions made at the
Quarries.]
In the work-yard, the preparation of the several courses of the
building was going progressively forward. The Ninth course was now
finished, and part of the Tenth laid upon the platform. At Mylnefield
Quarry, the operations were at a stand; for in winter, as formerly
mentioned, no work is done here, owing to the liability of the stones
to split in frosty weather, especially when newly taken from the
quarry, the laminæ of the strata being then charged with moisture.
But, as granite imbibes water very slowly, and is not liable to
those changes, every exertion continued to be made at the quarries
of Aberdeenshire, that, if possible, the outside casing of granite
might be carried to the height of 30 feet, or to the top of the solid
part of the building, instead of 16 feet, or to high-water mark, as
had been latterly intended. The stone-agent at Aberdeen, accordingly,
had a person traversing the numerous quarries in that neighbourhood,
while one of the foremen from the work-yard at Arbroath, was similarly
employed, during the winter months, at Peterhead; and whenever a stone
was found answerable to the Light-house moulds, it was immediately
purchased, and laid aside for the use of the Bell Rock.
[Sidenote: 1809, February.]
[Sidenote: Employment of Shipping.]
The sloops Smeaton and Alexander made several trips to the North, and
also to Mylnefield, near Dundee, for stones which had been quarried
in the course of the summer months, and were in no danger from the
frost; but owing to the difficult nature of the navigation of the Tay
in winter, these voyages were frequently attended with considerable
danger. On the last trip which the Smeaton made to this quarry, she
had a very narrow escape, and lost both her boat and an anchor; but
the hazardous state of the vessel and all on board, will be better
understood by the following very distinct and explicit letter or
journal from Mr Thomas Calder, commander of the Light-house Yacht, who,
on this occasion, was acting master on board of the Smeaton.
[Sidenote: Captain Calder’s account of a trip to the Tay.]
_“Arbroath, 25th February 1809._
“Mr STEVENSON.
“Sir,--At 3 o’clock P. M., on the 21st inst., I got under way from the
South Ferry Roads for Mylnefield quarry, wind at West. At 7 were about
a mile from the quarry pierhead. Light airs of wind. Got beset amongst
ice, and brought up with the small bower-anchor. At midnight, all hands
employed hanging fenders over the bows and sides, to save the vessel
from getting cut with the ice.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account