An Egyptian oasis : $b An account of the oasis of Kharga in the Libyan desert, with special reference to its history, physical geography, and water-supplyBeadnell, H. J. L. (Hugh John Llewellyn)
History
An Egyptian oasis : $b An account of the oasis of Kharga in the Libyan desert, with special reference to its history, physical geography, and water-supply
We have little, if any, information as to how the inhabitants kept
up their water-supply after the withdrawal of the Romans. Probably
there was a gradual diminution of the total output, as it is not
at all certain that any new wells were subsequently sunk—at any
rate, until after the introduction of modern hand-boring machinery
some fifty or sixty years ago. On that occasion one Hassan Effendi,
a servant of a French engineer of the name of Lefèvre, was sent
out by the Egyptian Government to instruct the inhabitants in the
use of the new machinery. Judging from their present proficiency
in sinking wells through difficult strata with the most hopelessly
worn and antiquated tackle, the natives did not take long to learn
the new system. Unfortunately, when left to themselves without
adequate supervision, they promiscuously sunk a great number of new
bores, without regard to the probable effects on the older wells
irrigating the existing palm-groves and cultivated lands, with the
result that, more especially in the oasis of Dakhla, a great deal
of harm was done. Whole districts suffered a general lowering of
water-level, many of the wells ceasing to flow altogether. This
was the direct outcome of the excessive number of new bores put
down in certain districts where the inhabitants were sufficiently
rich and influential to get and retain possession of the majority
of the newly-imported boring-rigs.
About ten years ago I studied the method of well-sinking used in
the oases, and found it to consist of a combination of ancient and
modern boring practices. Owing to the difficulty and prohibitive
cost of transporting heavy steel tubes across the desert, the use
of locally-made wooden casing could not be dispensed with, and as
casing of this description could not possibly be made of sufficient
strength to stand ‘driving,’ the upper portion of the well had
of necessity to take the form of an open shaft carried down as near
as possible to the water-bearing beds, the actual boring by means
of the drilling-plant being confined to the later stages.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account