An Egyptian oasis : $b An account of the oasis of Kharga in the Libyan desert, with special reference to its history, physical geography, and water-supplyBeadnell, H. J. L. (Hugh John Llewellyn)
History
An Egyptian oasis : $b An account of the oasis of Kharga in the Libyan desert, with special reference to its history, physical geography, and water-supply
Up to this point there is good reason to believe that the modern
practice is similar to, if not identical with, that anciently used;
but in the complete absence of evidence, documentary or otherwise,
we cannot conjecture how the old well-sinkers proceeded in subsequent
stages. We surmise, however, that, given sufficiency of time, they
were possessed of the requisite patience and skill to overcome
all ordinary obstacles—as has been the case for generations in
China—and it is probable that the percentage of wells abandoned
was not greater than it is at the present day in countries where
well-boring has become an art, carried out by means of scientifically
designed machinery.
The second part of the modern operations is conducted with an
ordinary percussion hand-boring outfit of European manufacture. As
the method of boring with this type of rig is essentially the same
all over the world, we only propose to describe it in brief. The
proceedings commence with the erection of a timber framework,
or derrick, immediately over the mouth of the pipe; at the summit
of the derrick is a pulley, over which passes the rope or chain
which connects on one side with the drum of the winch, and from
the end of which, on the other side, are suspended the actual tools
with which drilling is continued. The boring-rod is made up to the
required length by screwing together a number of 10-foot sections,
the terminal length being a shorter rod fitted with a chisel, auger,
or sand-pump, according to the work in hand.
The rate of progress depends to a great extent on the rapidity with
which the blows of the chisel are delivered. This, of course,
varies considerably, depending on the depth of the well and
consequent weight of the rods in use. Where the weight is great
and the formation sticky, the rods have to be lifted by means of
the winch, and not more than two or three blows a minute can be
struck. When the rods are light or working freely, as, for instance,
when drilling in sandstones, the winch can be dispensed with, and the
necessary motion conveyed by means of a lever actuated by a number
of men. In this way progress can be very much accelerated, as many
as twenty or twenty-five blows being delivered per minute. At the
best, however, the method of drilling by percussion with a solid
rod is necessarily slow, owing mainly to the fact that the terminal
tool cannot be changed or withdrawn without the entire length of
rod being taken to pieces. It is seldom, therefore, that a well of
120 to 150 metres is completed in less than five months, and the
average time taken is more like nine months or a year.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account