An Egyptian oasis : $b An account of the oasis of Kharga in the Libyan desert, with special reference to its history, physical geography, and water-supplyBeadnell, H. J. L. (Hugh John Llewellyn)
History
An Egyptian oasis : $b An account of the oasis of Kharga in the Libyan desert, with special reference to its history, physical geography, and water-supply
In the reclamation operations conducted in the oasis of Kharga
during the last two or three years, both hand and steam boring rigs
have been employed, steel casing being used for all wells. The cost
per foot drilled is somewhat in favour of the hand-rigs, but the
rate of progress is far more rapid in the case of the steam-driven
machines. The method used with the hand-machines is the same in
principle as that employed by the natives and already described,
with the exception that the preliminary excavation is dispensed with,
the bore being drilled from the surface and lined with metal casing
down to the Water-bearing Sandstones. The casing is driven by means
of a heavy weight, or ‘monkey,’ attached to the boring-rod.
The steam-rigs used are of American manufacture, and of the design
usually employed in the oil-fields of the United States. The method
is a modern adaptation of a practice employed from very early times
in China, free-falling tools attached to a flexible rope being used
in place of a solid iron rod. The actual drilling tool, which is of
great weight, is suspended from a cable, and worked by steam-power in
such a way as to give a rapid succession of blows of such force as
to cut out a circular hole through the hardest of rocks. The outfit
consists essentially of a very high derrick, a large drum on which
the cable is wound, and a specially-designed engine worked by steam,
the boiler in which the latter is generated being usually placed
on a separate carriage. A second and smaller drum is provided for
a fine wire rope, which is used with various forms of sand-pump for
cleaning out the loose sand or sludge formed by the drilling tool.
[Illustration: A STEAM BORING RIG.]
[Illustration: A HAND BORING RIG.]
These steam-rigs necessitate the employment of skilled drillers,
and are, moreover, with difficulty kept in proper repair in
out-of-the-way localities. Their initial cost is high; they are
extremely cumbersome to drag from one site to another over the
soft surface of the desert, and they consume a large quantity
of fuel. These drawbacks are, however, partly, if not entirely,
counterbalanced by the rapidity with which the work can be carried
out, the average rate of progress under the conditions met with
in the oasis being 5 to 7 metres per ‘shift’ of eight or ten
hours. In the water-sandstones I have known Mr. B. F. Whiting, who
was recently my drilling superintendent in the oasis, carry a bore
down as much as 20 or 25 metres in a single shift. Breakdowns are, of
course, not infrequent with this system of boring, but the American
drillers are remarkably proficient in the recovery of lost tools.
CHAPTER XIV
THE CONTEST BETWEEN MAN AND WIND-BORNE SAND
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account