=105. Bridge Plans and Shopwork.=—After the computations for a bridge
design are completed in a civil engineer’s office they are placed in
the drawing-room, where the most detailed and exact plans of every
piece which enters the bridge are made. The numerical computations
connected with this part of bridge construction are of a laborious
nature and must be made with absolute accuracy, otherwise it would be
quite impossible to put the bridge together in the field. The various
quantities of bars, plates, angles, and other shapes required are then
ordered from the rolling-mill by means of these plans or drawings. On
receipt of the material at the shop the shopwork of manufacture is
begun, and it involves a great variety of operations. The bridge-shop
is filled with tools and engines of the heaviest description. Punches,
lathes, planers, riveters, forges, boring and other machines of the
largest dimensions are all brought to bear in the manufacture of the
completed bridge.
=106. Erection of Bridges.=—When the shop operations are completed
the bridge members are shipped to the site where the bridge is to be
erected or put in place for final use. A timber staging, frequently
of the heaviest timbers for large spans, called false works, is first
erected in a temporary but very substantial manner. The top of this
false work, or timber staging, is of such height that it will receive
the steelwork of the bridge at exactly the right elevation. The bridge
members are then brought onto the staging and each put in place and
joined with pins and rivets. If the shopwork has not been done with
mathematical accuracy, the bridge will not go together. On the accuracy
of the shopwork, therefore, depends the possibility of properly fitting
and joining the structure in its final position. The operations of the
shop are so nicely disposed and so accurately performed that it is not
an exaggeration to state that the serious misfit of a bridge member
in American engineering practice at the present time is practically
impossible. This leads to rapid erection so that the steelwork of a
pin-connected railroad bridge 500 feet long can be put in place on the
timber staging, or false works, and made safe in less than four days,
although such a feat would have been considered impossible twenty years
ago.
[Illustration: FIG. 27.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account