Annals of a FortressViollet-le-Duc, Eugène-Emmanuel
History
Annals of a Fortress
Viollet-le-Duc, Eugène-Emmanuel
Fortification -- France -- History; Fortification -- History; Siege warfare -- History
Referring to the general defensive system shown in Fig. 83, and required
the plan of one of the forts, A, the result will be Fig. 84, giving the
work at the lower level at C, and at the level of the batteries at D.
The counterscarp should be cased up to at least sixteen or seventeen
feet above the bottom of the ditch.
The escarp should be made with tipped earth. The masonry works should
all be covered and secured from being enfiladed; they form casemates
inside E. Beneath the terracings, powder magazines, F, and the passages
communicating with the _oiseaux_ or lower _orillons_, G, protected by
the counterscarp and the covered way, and which are used only if the
enemy attempts to pass the ditch. The faces and flanks on the outside
are planned on angles sufficiently obtuse to cross their fires. The two
faces in the plan (Fig. 84) may be armed with eight guns and the flanks
with six guns. This work is separated from that of the gorge by a
traverse that efficiently protects this gorge, which possesses its
flanks, armed with four guns and its orillons.
From the work of the gorge is a communication into the fort by a covered
caponnière, forming traverse in the direction of the _capital_ or centre
line. The gorge is defended by a curtain for the riflemen, and, at need,
for small pieces of artillery. At need also, on the terre-plein of the
work of the gorge may be mounted guns of long range, affording an
indirect fire in the circumference of a semi-circle, over the great
traverse H, if the parapets of the faces are damaged by the fire of the
enemy.
Fausse-braies consisting of palings are fixed in the ditch at ten feet
from the base of the escarp, to hinder the fallen _débris_ of the escarp
from filling up the ditch, and to enable its passage to be defended. The
well-covered internal masonry works prevent the accumulation of earth on
the interior platforms, and afford casemates, which enable the garrison
to take rest in perfect security; at any rate along the two faces and
the great traverse. Blindages can be set up on the traverses of the
batteries, and can be easily repaired every night, as well as the escarp
of tipped earth.
It would be difficult to say how many projectiles it would require to
render such a work untenable; since we have seen in the siege of Paris,
that a marine battery erected on tipped earth on the military road
between the forts of Rosny and de Noisy, armed with three guns, had been
a mark for the German shells during twenty-four days, without any of its
guns having been dismounted, or its escarp suffering more than could be
made good each night.
Permanent works should, however, only be established with the utmost
circumspection:--1. Because they require a very considerable outlay. 2.
Because they are necessarily familiar to, and for a long while studied
by the enemy, who takes his measures accordingly.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account