=The Simplon Tunnel.=--The following facts are taken from a brief
account of this great engineering feat in the Engineering Magazine:
There is at present no direct rail connection between western
Switzerland and Italy, and to reach Milan it has been necessary to
go around to Lucerne and so on through by the St. Gothard route.
The distance by rail from Milan to Calais by the Mont Cenis is 665
miles, and by the St. Gothard 680 miles. The distance by way of the
Simplon Tunnel will be only 585 miles. The Jura-Simplon Railway from
Geneva around the lake and up the Rhone Valley ascends to Brieg at an
altitude of about 2,300 feet, while on the Italian side the railway
from Milan stops at Domodossola, at an altitude of 900 feet. Between
the two, which are 41 miles apart and over an elevation of 6,590 feet,
lies the famous Simplon Pass. Connection is now made by diligence,
the trip occupying a whole day. The plan of the new railway includes
the prolongation of the present line on the Italian side to Iselle,
at an altitude of about 2,100 feet, where the Italian entrance to the
tunnel was begun in August, 1898. On the Swiss side the entrance is at
Brieg, and the tunnel will connect these two towns, being 12.26 miles
long. This is nearly three miles longer than the St. Gothard, but the
altitude is only 2,300 feet above the sea, instead of 3,800 feet, as at
the St. Gothard. The tunnel is to be straight laterally, but higher in
the middle than at either end, the grade being 1 in 143 on the Italian
and 1 in 500 on the Swiss side. The principal difference between the
Simplon Tunnel and those previously pierced through the Alps is that,
instead of one single tunnel, two separate tunnels, fifty-five feet
apart, are to be constructed, connected by lateral passageways every
650 feet. At first but one of these is to be completed to the full
dimensions, the other being carried through at only about a quarter of
the ultimate cross-section, and not enlarged and put into use until
the traffic demands it. Both tunnels are now being bored by the use of
the Brandt hydraulic rotary drills, water being supplied at a pressure
of 70 to 100 atmospheres. The borings are through gneiss, limestone,
and slate. Holes two inches and three quarters in diameter and four or
five feet deep are bored and the rock dislodged by means of dynamite.
A narrow-gauge railway is used to remove the _débris_. It is expected
that the tunnel will be completed in five years and a half. At the
close of 1898, 300 feet had been penetrated on the south side and 1,300
on the north. The estimated cost of the complete double-track tunnels
is 69,000,000 francs. This does not include the construction of the
permanent way. The Mont Cenis Tunnel cost 75,000,000 francs, and the
St. Gothard 59,750,000 francs. The work is practically controlled by
the Jura-Simplon Railway.
* * * * *
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account