Almost two-thirds of the thermal energy output in 1970 was based on
natural gas fuel, and one-third, on coal--mostly coal of very low
quality. Less than 3 percent of the fuel used was accounted for by oil.
The proportion of natural gas in the fuel balance was roughly the same
as in 1960 but ten percentage points lower than in 1965. The share of
coal, particularly of low-grade coal, has been rising, in line with the
government's policy of conserving natural gas for use in the
petrochemical industry.
In 1971 construction was virtually completed of a huge hydroelectric
station at the Iron Gate on the Danube River, built jointly with
Yugoslavia and equipped, in part, with turbines made in the Soviet
Union. The station's twelve turbines have a total capacity of 2.1
million kilowatts and are planned to produce about 11 billion
kilowatt-hours of electricity per year. The output is to be evenly
divided between the two participating countries. Nine of the twelve
turbines were reported to have been in operation in September, and six
were reported to have been connected to the Romanian national power grid
in November. Completion of the Romanian portion of the project almost
doubled the country's hydroelectric capacity and increased its power
output potential by about 15 percent.
A second, much smaller, hydroelectric station with a capacity of 400,000
kilowatts and a planned output of 1.5 billion kilowatt-hours per year is
to be built jointly with Yugoslavia on the Danube River below the Iron
Gate plant. Plans for this station were to be initialed by the
negotiators before the end of 1971, but information on the dates for the
start and completion of construction is not available. Plans for the
construction of yet another power station on the Danube River, as a
joint venture with Bulgaria in the Cernavoda-Silistra area, were
announced in the fall of 1971. This station is to have a capacity of
760,000 kilowatts and an annual output of about 3.8 billion
kilowatt-hours. Construction is apparently scheduled to begin in 1975.
An agreement with the Soviet Union to build a 440,000-kilowatt nuclear
power station, using a Soviet reactor, was signed in May 1970.
Construction of the plant is to begin in 1972, and completion is
scheduled for 1978. The agreement culminated extensive negotiations with
the Soviet Union and several noncommunist countries. The ultimate choice
is believed by Western observers to have been dictated primarily by
political considerations.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account