To utilize these sources, however, would have involved condemnation of the
water-rights in the case of the springs, depriving present owners of the
use of the water, and this Governor Reyes wished to avoid. Besides, it
would have necessitated pumping the water for the city in perpetuity, an
expense which the Governor was equally anxious to save; hence a gravity
supply was made the prime requisite of the plans.
Until the concession was granted, and for a year or more afterward, it was
assumed that an adequate supply could only be obtained by the storage of
the flood-water of the Santa Catarina River in a large reservoir; and the
earlier plans of the concessionaires were based on the construction of a
high masonry storage dam at the upper end of the "narrows," where the
river turns from a western direction to a course almost due east, between
high vertical cliffs of limestone. The concession distinctly provided for
such a dam, and among the plans on file in the State Capitol is one
prepared by the late E. Sherman Gould, M. Am. Soc. C. E., for a masonry
weir across the gorge. Samuel M. Gray, M. Am. Soc. C. E., also filed a
plan and report proposing a capacious, shallow, storage reservoir near the
city, to be filled by a large flood-water canal from the Santa Catarina
Canon.
Although the writer could not have anticipated the occurrence of floods of
the magnitude of the one of August, 1909, which would surely have
destroyed any reservoir built in the Canon, he was unable to endorse the
storage plan of water development, chiefly because of the uncertainty of
the water-tightness of the reservoir in a cavernous limestone formation,
and also because of the probable impurity of water draining from such
extensive goat pastures. He, therefore, urged the development of the
underflow of the river, which was manifesting itself in the springs
referred to. Mr. Binckley secured two Keystone drilling machines and
proceeded to profile the bed-rock at Santa Catarina Canon and at San
Geronimo, the two places on the stream where the river flows between walls
of rock _in situ_. At both sites the strata were standing nearly vertical
across the channel, and, by careful sampling and testing, it was found
that in both locations there were thick strata of limestone so highly
silicious as to be insoluble, and hence free from caverns. From this
determination it was concluded that all the water which appeared in the
valley below must pass through the sections where the borings were made.
The results of this drilling, however, proved conclusively that the depth
to bed-rock at either place was too great to permit of a masonry dam being
considered as practical, and demonstrated the inadequacy of methods which
had been used in the earlier investigations when dams were regarded as
feasible.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account