=28.= Successive frames are placed in the same manner until the
one directly over the gallery is reached. Great care is taken to place
this frame at exactly the right height, and the shaft is then continued
to the required depth. A frame is placed at the bottom with its top at
the level of the floor of the gallery, and the sheeting is allowed to
rest directly against the outside of this frame. When the soil will
allow it, the sheeting is omitted wholly or in part over the portion of
the shaft which is to form the gallery entrance.
=29. Precautions.=--In sinking shafts especial care must be taken
to make the excavation no larger than is required for placing the
lining, since if a vacant space is left outside the lining the sides of
the shaft may give way through its entire height, and fall against the
lining with a blow which will crush it in.
_This is often the cause of fatal accidents both in shafts and
galleries._
=30. Partly-lined Shafts=, i.e., those in which the
sheeting-planks are separated from each other by greater or less
intervals, should only be used for small depths and when they are
expected to stand for a very short time.
They are a constant menace to the miners, owing to the danger of their
caving in, and in a much greater degree to the probability of stones,
etc., falling from the unprotected parts and seriously injuring or
killing the men at the bottom.
=31. Driving a Gallery with Frames and Sheeting.=--The direction
of the gallery has already been marked by the scores on the shaft
frames; but it must be verified by plumb-lines, and two small pickets
be driven on the line of its axis, which is located exactly by small
nails, one driven in the head of each picket.
Two gauge-rods are prepared, giving the extreme height and breadth of
the excavation, i.e., the height of the frame plus two thicknesses of
top sheeting, and the breadth of the frame plus four thicknesses of
side sheeting. The middle of each gauge-rod is also plainly marked.
A gallery frame is set up against the side of the shaft (Pl. XI, Fig.
17), its ground-sill flush with the bottom frame of the shaft; or its
stanchions may rest upon the shaft frame as a ground-sill.
The gallery frame is carefully located and fastened in position with
battens and braces. The shaft sheeting is then forced down two or three
inches with a bar, and the top sheeting of the gallery inserted and
driven in until its end is supported by the earth. It is given the
proper upward pitch by a scantling laid across it and secured to the
shaft frames. The shaft sheeting is forced further down, the earth at
the top excavated, and the top gallery sheeting advanced. As this work
proceeds the side sheeting-planks are successively inserted and driven
forward.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account