The average cost of those already completed scarcely exceeds £8,500
a mile,[8] including carriages and buildings. The most expensive
line was that from Louvain to Tirlemont, which, including the tunnel
I have mentioned, cost £11,661 a mile, and the cheapest, that from
Dendermonde to Mechlin, which, as the level surface of the ground had
barely to be disturbed for laying down the rails, cost only £4,583.
This, however, is for single lines of rails; that alone from Brussels
to Antwerp being yet laid with double, though all have been constructed
with a view to their ultimate adoption. The line now in progress from
Liege to Verviers, passing, as it does, through a most unequal and
hilly country in the vicinity of the Vesdre, will, I imagine, from the
numerous embankments and cuttings through rocks, be the most costly
yet attempted. The natural facility of the ground, and the consequent
simplicity of the work, led to one result very different from our
experience in England;--the actual costs of the works, even on the most
difficult sections, have not exceeded the estimates by more than eight
per cent.
In England, the least expensive line yet opened has cost £10,000 a
mile, (in Ireland one has been completed, from Belfast to Lisburn,
for less than £7000), but others have cost upwards of £40,000; and the
average of forty-five lines, for which bills were passed in 1836 and
1837, was upwards of £17,500 a mile _on the estimate_, which may have
fallen much below the actual outlay subsequently. But, besides the mere
facilities of the country; other causes have contributed to render
the expenses in Belgium infinitely lower than those of Great Britain;
in the former, there were no committees of the House of Commons to
enable the solicitors’ bills to mount to 70 and £80,000 for expenses of
obtaining an act, as was the case on the instances of the London and
Birmingham line, and that of the Great Western; nor were there rich
demesnes and parks to be preserved, whose proprietors were to receive
the _prætium affectionis_ in compensation for the damages; nor towns
to be entered in search of termini, where whole streets of houses and
acres of building ground were to be purchased up, at an expense that
would prove ruinous to any but the joint-stock capital of a railroad.
Their engineers too were enabled to avoid the expense, whilst they
profited by the success of the experiments in every stage which were
making in England--experiments which were even more costly when they
failed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account