Leaving Florianapolis the vessel skirts along the shores of Santa
Catharina, and for a long distance along the low coast of the state of
Rio Grande do Sul, until the port of the same name, the most southerly
port of the republic, is reached. The coast line of this state is
peculiar in that it consists of lakes or lagoons, which are separated
from the sea by comparatively narrow strips of land. The principal lake,
called Lagoa dos Patos (Ducks Lake), is one hundred and fifty miles long
and from twenty to thirty miles wide, and has only one narrow channel
connecting it with the ocean, that at Rio Grande do Sul, at its southerly
extremity. The lake is not very deep, but a twelve foot channel has been
dredged to Pelotas, and a ten foot channel has been completed almost to
Porto Alegre. At the entrance there are sandbars which make it impossible
for deep draught vessels to enter, but the coasting boats proceed up to
the furthermost extremity, at which is located the largest city of the
state, Porto Alegre, the “merry port.”
The government is now engaged in the work of dredging a channel to a
depth of ten meters (thirty-two and eight-tenths feet) over this bar
which, with the port works planned, will give Rio Grande do Sul one of
the best harbours on the Brazilian coast, and will probably make it the
chief city south of São Paulo. The cost of this improvement will be
about $10,000,000 in gold, for which a special tax of two per cent. on
all goods coming into the state through this channel has been levied.
The port works will cost almost an equal sum, and a concession has been
granted to a company which agrees to make this improvement. The plan
adopted is to construct two parallel dikes, or jetties, from the mouth of
the river into the new harbour, and there construct basins which will be
large enough to manœuvre the largest vessels afloat. Rubble stones and
immense cement blocks will be used for this work, and it is estimated
that at least four million tons of this material will be required. At
least ten million cubic yards will have to be dredged for the channel and
basins. The sand and clay brought up by the dredges will be deposited
inside the revetments in order to fill up the low land. This improvement
was formally begun December 11th, 1907, and the preliminary work has
been done, so that the main part of the undertaking is now progressing
very satisfactorily. An American engineer is in charge of the work, but
the contract is held by a French company. It is expected that this much
needed improvement, which has been under consideration for a quarter of a
century, will be completed in 1913. This will revolutionize this port and
make Rio Grande do Sul a port of call for European and American steamers.
It will not only give an easy outlet to Southern Brazil, but a much
shorter one for Northern Uruguay and a part of Argentina.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account