Canada -- History -- Sources; Great Britain -- History -- Sources
The swamp occasioned many anxious nights, and much burning of
midnight oil. At places it appeared to be bottomless. The ballast
locomotive would haul train after train-load of spoil excavated
from the ballast-pit, and push it cautiously along to the end of
the dump, where the trucks would be discharged. The rubble would
rush down the declivity, and as it came into contact with the
surface of the morass there would be a wicked squelch. Then the bog
would open, and slowly, but surely and silently, the discharged
mass would disappear into the viscous mass until the last vestige
had slipped from sight, and the slime had rolled over the spot,
concealing all evidences of the few hundred tons of material
emptied on to the spot but a few minutes before. The engineer would
sound the bog anxiously for signs of the bottom. Yes, he could feel
it all right--10, 15, perhaps 20 feet below the surface. The trains
would continue to rattle up and down with heavily laden trucks,
and send the contents crashing pell-mell into the swamp below. Ten
train-loads of gravel, rock, and what not would disappear from
sight, and the engineer would probe the treacherous sponge once
more. But the soundings did not vary a foot. Where had the dump
gone? The ballast had sunk simply to the bottom of the bog, and had
spread itself out on all sides, finding its own level like water.
The bed of the morass was as broken as the hill-side near by,
and was intersected in all directions by ruts and gullies. Until
these holes were filled, there could be no possible hope of the
embankment appearing above the surface of the bog....
While the upper stretches of New Ontario and Quebec were
occasioning the engineers many anxious moments, owing to the
eccentricities of the muskeg and swamp, the graders advancing
eastwards from Winnipeg were in close grips with rock, which
offered a most stubborn resistance....
For hour after hour, day after day, month after month, nothing was
heard but the chink-chink of drills and the devastating roar of
explosive with its splitting and disintegrating work. Advance was
exceedingly slow, some of the blasts requiring as much as six weeks
or more to prepare, and then only breaking up sufficient of the
granite mass to permit of an advance of about 200 feet....
It was on work of this nature where the greatest number of
accidents occurred, the majority of which might have been avoided
had the men engaged in the operations displayed but ordinary
care.... Dynamite was responsible for more deaths on this
undertaking than any other accident--the collapse of the Quebec
Bridge notwithstanding--and sickness combined....
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account