It was at first thought that the existing plants might be able to
supply the government’s need of chlorine. The pre-war production
averaged about 450 tons (900,000 pounds) per day. The greater amount
of this was used in the preparation of bleach, only about 60,000
pounds per day being liquefied. Only a few of the plants were capable
of even limited expansion. In an attempt to conserve the supply, the
paper mills agreed to use only half as much bleach during the war,
which arrangement added considerably to the supply available for war
purposes. It was soon recognized that even with these accessions, large
additions would have to be made to the chlorine output of the country
in order to meet the proposed toxic gas requirements.
After a careful consideration of all the factors, the most important
of which was the question of electrical energy, it was decided to
build a chlorine plant at Edgewood Arsenal, with a capacity of 100
tons (200,000 pounds) per day. The Nelson cell was selected for use
in the proposed plant. During the process of erection of the plant,
the Warner-Klipstein Chemical Company, which was operating the Nelson
cell in its plant in Charleston, West Virginia, agreed that men might
be sent to their plant to acquire the special knowledge required for
operating such a plant. Thus when the plant was ready for operation,
trained men were at once available.
[Illustration: FIG. 19.—Chlorine Plant, Edgewood Arsenal.]
[Illustration: FIG. 20.—Ground Plan of Chlorine Caustic Soda Plant,
Edgewood Arsenal.]
The following description of the plant is taken from an article by S.
M. Green in _Chemical and Metallurgical Engineering_ for July 1, 1919:
“The chlorine plant building, a ground plan of which is shown in
Figure 20, consisted of a salt storage and treating building, two
cell buildings, a rotary converter building, etc. In connection with
the chlorine plant, there was also constructed a liquefying plant for
chlorine and a sulfur chloride manufacturing and distilling plant.
“The salt storage and treating building was located on ground much
below the cell buildings, which allowed the railroad to enter the
brine building on the top of the salt storage tanks. These tanks were
constructed of concrete. There were seven of these tanks, 34 feet long,
28 feet wide and 20 feet deep having a capacity for storing 4,000 tons
of salt. There would have been 200 tons of salt used per day when the
plant was running at full capacity.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account