“We have at length reached that period, when the extensive alteration,
or even re-building, of London Bridge, began to form a matter of
grave and active consideration; and in relating the proceedings of
these times, there will be no little difficulty in condensing into
one consecutive account, all the numerous surveys, reports, plans,
proposals, and objections, which were then published. In treating of
this part of the subject, however, as it will be best and briefest to
do it in order, we will first consider the state of old London Bridge,
as it was represented by the various Architects employed to survey it;
then give some account of the schemes proposed for its alteration;
and lastly, describe that which was adopted, and the means used for
carrying it into effect.
“It appears extremely probable, that the contrast presented by the
broad and clear road of the new Bridge at Westminster,--which was
commenced in September, 1738, and completed in November, 1749,--chiefly
contributed to turn the attention of the Corporation of London to
the exceeding inconvenience of their own. Though to the building
of Westminster Bridge, Maitland, who knew the circumstances, tells
us in his ‘_History_,’ volume ii., page 1349, that there was very
considerable opposition; and that the City of London, the Borough of
Southwark, the Company of Watermen, and the West-Country Bargemen, all
petitioned the Parliament against it. On Friday, February the 22d,
1754, as we learn from the ‘_Public Advertiser_’ of the day following,
the Court of Common Council took into consideration a motion for the
construction of a new Bridge between London and Southwark: when, after
a debate of nearly four hours, it was withdrawn, and a Committee
appointed, consisting, as usual, of the Aldermen, Deputies, and one
Common-Councilman from each Ward, to consider of the best means of
rendering the old Bridge safe and convenient; who were empowered to
draw upon the Chamberlain to the amount of £100, for plans, surveys,
&c. The Report of this Committee stated, that the Bridge foundation
was still good, and that, by pulling down the houses, and making such
repairs as should then be required, the edifice might be rendered
equally serviceable with Westminster Bridge; being capable of receiving
four carriages abreast, with a good foot way on each side. By pulling
down the houses at the corners of the narrow streets leading to the
old Bridge, it was also represented that it would be rendered so
convenient as to supersede the erection of any new one. To this it
was objected, that most of the houses declined considerably out of
the perpendicular; and that those on the Eastern side of the Bridge
decayed much faster than the opposite ones. In Harrison’s ‘_History_,’
page 24, this account is partly confirmed; since we are there told
that ‘on the outer part of the Bridge, on the East side, the view
from the wharfs and quays was exceedingly disagreeable. Nineteen
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account