Cyclopedia of Commerce, Accountancy, Business Administration, v. 02 (of 10)American School of Correspondence
General
Cyclopedia of Commerce, Accountancy, Business Administration, v. 02 (of 10)
American School of Correspondence
Accounting; Business; Commerce
A steam─shovel crew has a good deal more pride in its work, and will
continue working under more disagreeable weather conditions, than a
drilling gang; and when drilling in front of a shovel, severe weather
conditions may cause the drilling work to stop without interrupting the
operation of the shovel. If, then, the drills are working too close to
the shovel, the shovel may catch them.
On the other hand, it is unwise to blast far ahead of the shovel, for
a number of reasons. In the first place, there is no advantage in
investing money in drill holes, except to avoid such a contingency
as outlined above. In the second place, it is impossible to tell how
effective the blasting has been until the shovel has attacked the
broken rock; and if the blasting is done far ahead of the shovel, poor
blasting may go undetected until an immense amount of financial damage
has been done.
To cite a specific instance──On a recent piece of important work, a cut
several hundred feet long was drilled to a depth of supposedly fourteen
feet, and blasted with more or less unsatisfactory results. The steam
shovel was then put in, and excavated to a depth of five or six feet.
The subsequent cut of from eight to nine feet deep had to be entirely
re─drilled and re─blasted. The drilling in the already partly broken
rock was immensely difficult, the drills sticking a great deal and a
good many of the holes having to be abandoned; while the blasting was
unsatisfactory because of the fissures.
The rapid reorganization of work can be furthered by the issuance of
_special instructions to foremen in the field_. This practice has been
admirably followed by Frank B. Gilbreth, and is described in his "Field
System." As illustrations of such orders, are the following to drill
and blasting foremen, issued on some recent work:
INSTRUCTIONS TO FOREMEN
RULES FOR DRILLING──
Drill foremen are requested to do their utmost to enforce the
following rules for drilling:
1. Each drill at the beginning of a hole is to be supplied with a
complete set of sharp bits and a pump, which will be laid alongside
of the drill tripod by the drill tender, under the directions of the
foreman.
2. As soon as a hole is finished, one of the muckers at the direction
of the foreman will assist the two drill runners to move the tripod;
and the mucker under the direction of the foreman will then pump out
the hole that has just been completed.
3. The foreman will then personally, with a wooden rod, measure the
depth of the hole, and punch said depth on the drillers' card, the
mucker placing a well─made round plug in the hole and hammering it
home.
4. Foremen will see that the drills are so distributed as to keep them
as near as possible to the manifold, from which the steam supply is
taken.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account