This basin being finished and covered with a flat stone or other suitable
material, connect it with the outlet by an open ditch, unless the bottom
of the ditch, when laid open to the proper depth, be found to be of muck
or quicksand. In such case, it will be best to lay the tile at once, and
cover it in for the whole distance, as, on a soft bottom, it would be
difficult to lay it well when the full drainage of the field is flowing
through the ditch. The tiles should be laid with all care, on a perfectly
regulated fall,—using strips of board under them if the bottom is shaky or
soft,—as on this line depends the success of all the drains above it,
which might be rendered useless by a single badly laid tile at this point,
or by any other cause of obstruction to the flow.
While the work is progressing in the field above, there will be a great
deal of muddy water and some sticks, grass, and other rubbish, running
from the ditches above the basin, and care must be taken to prevent this
drain from becoming choked. A piece of wire cloth, or basket work, placed
over the outlet in the basin, will keep out the coarser matters, and the
mud which would accumulate in the tile may be removed by occasional
flushing. This is done by crowding a tuft of grass,—or a bit of sod,—into
the lower end of the tile (at the outlet,) securing it there until the
water rises in the basin, and then removing it. The rush of water will be
sufficient to wash the tile clean.
This plan is not without objections, and, as a rule, it is never well to
lay any tiles at the lower end of a drain until all above it is finished;
but when a considerable outlet must be secured through soft land, which is
inclined to cave in, and to get soft at the bottom, it will save labor to
secure the tile in place before much water reaches it, even though it
require a daily flushing to keep it clean.
*Opening the Ditches.*—Thus far it has been sought to secure a permanent
outlet, and to connect it by a secure channel, with the silt-basin, which
is to collect the water of the different series of drains. The next step
is to lay open the ditches for these. It will be best to commence with the
main line _A_ and its laterals, as they will take most of the water which
now flows through the open brook, and prevent its interference with the
rest of the work.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account