The allowance for lateral settlement should be liberal and be regulated
by the nature of the earth, the height of an embankment, and other local
conditions of situation and rainfall that affect earth, many of which
are named in other chapters. It will vary greatly, and may be anything,
from 5 per cent. to 100 per cent. additional width of formation. An
addition of from 5 to 10 per cent. of the height of an embankment is
usually sufficient, but in clay sand and such soils an embankment may be
slowly washed away by rain until it has shrunk to half its required
width. As an embankment settles or weathers the width of the formation
should be maintained without having to steepen the slope, widen the top,
or erect a wall upon the formation in order to hold the added earth. The
additional formation width of embankments is also a provision against
the effects which the “lurching” of an engine may cause by its weight
temporarily acting upon one rail, and the pressure to be in the 4 feet
8½ inches gauge at a distance of about 2 feet 6 inches from the centre
of the permanent way. For some distance upon each side of the point of
junction of two high tip heads the top width should be increased, _vide_
Chap. IX., and in sidelong ground it is advisable to widen an embankment
more on the upper side than the lower, as slips seldom occur upon the
higher side; and in the case of railways, should the lower slope move,
the rails can be placed towards the hill, and perhaps away from the
slipped portion of the embankment.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account