Should an embankment have to be tipped upon rock, care must be taken to
prevent the surface water flowing under its base, and to counteract
sliding movement the ground should be benched and a drain made on the
higher side; also in a deep cutting the slope or face should be stepped,
or have a cess at about mid-height, or where desirable, to lessen the
effect of the trickling of the surface water and to prevent a flow in a
direct line, which might make the velocity of any leakage waters
dangerous, especially after a rapid thaw. On a mid-cess a catchwater
drain should be cut to intercept the surface water, which may not
percolate but flow upon the slope, and, unless diverted and conducted to
an outlet, may saturate or erode the bottom.
Before a cutting in drift soil upon the side of a hill can be drained,
it may be necessary to sink a shaft upon the higher side some distance
from the slope and construct a complete series of drains under the
formation. Also should an embankment in sidelong ground be near to a
river, the exposed river-bank face must be protected, and in any case,
when a pier of a bridge has to be placed close to the edge of a rock,
the face of the earth should be preserved by a substantial Portland
cement concrete covering in order to prevent disintegration culminating
in a slip or subsidence.
In setting out a line of railway or a canal care should be taken to
avoid, if practicable, either cuttings or embankments in soil resting
upon inclined rock, as slips are almost sure to occur. However, should
it be unavoidable, their depth and height should be reduced to a minimum
and, if possible, the formation be raised until the bare rock crops out,
and this can frequently be effected within the limits of deviation. Also
deep cuttings in clay or earth, having particles soon affected by
weather, should be avoided, but they may be necessary; and should any
have to be located upon a sharp curve, it is advisable to excavate the
projecting spur on the convex side of the curve more than that required
to obtain the formation width, as it is peculiarly exposed, and
therefore more likely to slip. When cuttings are upon the escarpment of
a clay hill the slope upon the valley side need not be so flat as that
against the hill. An inclination of 3 or 4 to 1 may be necessary upon
the hill-side, whereas a 1½ to 1 slope may be sufficient upon the other.
When a slip may involve the destruction or injury of any adjacent
buildings, the best plan is to erect a retaining wall at the foot of a
slope, not less than about one-fourth of the height of an embankment or
the depth of a cutting, ample provision being made for drainage and the
expansion of the earth. It is a sure protection and support, and the
consequences of a slip may be most serious in such a position. The
protection of the slope and a breast wall may, however, be alone
necessary upon the valley-side.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account