The selection of the site of a dock is generally confined within narrow
limits such as railway connection, roads, location of the want of dock
accommodation, currents, the proper position of the entrances, &c., &c.;
nevertheless the nature of the soil should be considered, for upon a
tidal river a few hundred feet one way or other may cause the works to
be upon various kinds of earth each more or less treacherous, and when
intermixed perhaps more unstable. Even upon one side of a comparatively
narrow river the earth may be in a much more stable condition than upon
the other; and when an old watercourse or a dry ditch passes across the
site of a dock it must not be disregarded, as failures and damage have
occurred because the same section of a wall was continued throughout. It
is then necessary to adopt a system of construction suitable for softer
or less stable ground, and especially so if the wall has to be built
upon a firm stratum overlying sand, as a diminution in the thickness of
the bed may cause a settlement and the wall to be pushed forward; for
there is always danger in sandy soils, unless the superimposed layer is
of considerable thickness, that the latter may be pierced and the whole
site be in jeopardy from a flow of the sand.
It may be that a dock must be built at a particular place, although the
ground may be full of springs, the beds inclined, or a level stratum
overlies an inclined bed of rock or softer earth incapable of standing
at any but a flat slope, the whole being an unstable mass, for the
deposits may extend to such considerable depths that to go below them is
impracticable; however, uniform weighting and consolidation by the
deposition of firm soils having insoluble particles will generally make
it firmer, and by compression and admixture will ultimately cause the
ground to be more solid. It should be loaded as long as possible, and
the material be deposited beyond the site so as to prevent the outside
and less consolidated earth slipping upon the works, and as it will be
disturbed by the loaded portion having subsided it may require slight
support upon the lower portion of the slope. When the settlement over
the base and the slopes to the original bed is equal and regular and
care is taken that the soft soil cannot run, by a due protection of its
surface it can be built upon. The rise of the mud in front and for some
distance from the wall is generally from about one-third to one-half of
its subsidence when loaded. The rate of sinking and uplifting of the
soil should be noticed, and whether it is equable and the depth to which
settlement extends is the same over a considerable area and practically
ceases at a certain depth.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account