clear the water as effectually and enable the soil to settle to its new
state. The location of the sump should be at or about the lowest level
of the ground well away from any wall or the dock area, and on the line
of the greatest flow of the land waters or natural watercourse, thus,
dealing with them before they reach the site of the works.
In loose and almost all earth the foundations should be covered up
quickly so as to preserve the natural condition of the soil. It is also
important to offer every possible support to the earth to prevent
initial movement, and slight assistance may afford the required
strength.
Unless there are cogent reasons to the contrary, the excavation for
dock-walls is better executed in trenches, the frames of which being
struck as the work progresses can be used again; the wall can thus be
supported by the earth on either side, and no lateral thrust is brought
upon the wall until it has set, and therefore the danger of bringing,
perhaps, the greatest strain upon it when in an imperfectly solid
condition is obviated, the back and top of the wall being protected from
the weather, and any movement or slip of the earth prevented; hence a
wall should act as quickly as practicable as a monolithic mass, and the
material forming it be thoroughly bonded and set in Portland cement or
the best hydraulic lime mortar, or be wholly of strong Portland cement
concrete.
The trench system of constructing dock-walls, covered ways, and all work
below ground is the safest to adopt, and in loose soils or clay that
expands and is quickly affected by atmospheric influences, and where
there are buildings or the ground is weighted, the erection of side
walls in trenches, and then the completion of the invert or arch is
often the only way in which the work can be executed. Even should the
formation be rocky, and the beds be inclined towards the site, the short
15 to 20 feet in length trench system is the best to adopt; and it may
be advisable or necessary to work day and night in order that the ground
may be left exposed for the least possible time and as machine mixed
Portland cement concrete walls can be erected much quicker than masonry
or brickwork, in such situations it is the best material to use. The
excavation for the walls should be confined within the smallest limits,
but no under-cutting should be allowed in the excavation trenches, or
the portion undercut may strain the upper part and cause it to slip and
subside.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account