The arched wall system is sometimes adopted for docks, but as it
requires a longer time to construct, and is obviously more liable to be
damaged from settlement and by pressure of the earth and the failure of
joints and weak places, solid walls of Portland cement concrete with a
hard face are more to be desired; as in such situations a monolithic and
equally resisting mass is required, weight and mass being of importance.
The relative bulk of materials for a certain expenditure should be
considered, as it may happen that greatly increased weight and mass may
be obtained for no extra expense by the employment of a certain
substance. Combinations of brickwork and masonry and concrete are being
abandoned in favour of one homogeneous material throughout, and no yet
known aggregate fulfils this condition for such work as Portland cement
concrete, owing to the difficulty of making secure and perfect joints,
although hard brick facing may be necessary to protect the face from
wear by the rubbing of vessels. By a judicious adoption of material for
a dock-wall in order to give it weight and mass, and sufficiently deep
foundations, neither counterforts nor other special means of protection
against failure may be required, and slips and movements of the earth
may be prevented.
In the case of a stratum of soft soil of considerable depth overlying a
firm foundation, dock and quay-walls upon arches, not exceeding about 30
feet span, have been successfully erected upon wells sunk in or to the
solid ground, when by reason of the cost it was impracticable to carry a
solid wall to the firm ground; and no slipping, sliding forward, or
subsidence has occurred.
To prevent movement of the earth at the back of a wall pushing or
fracturing it and being the cause of a slip, it may be well to briefly
state a few points to which attention should be especially directed.
In adopting two systems of design of a wall, it is advisable that the
change of form be gradual and not made abruptly, or cracks may occur
from unequal settlement or load upon the foundations, and also when a
concrete bed is used under a wall a lime concrete layer cannot be firmly
joined to one composed of more solid and unyielding material, such as
Portland cement concrete. Similar walls erected upon different soils are
not equally strained, as one earth may scarcely change from the effects
of air and water, and another may vary daily according to the weather.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account