Earthwork Slips and Subsidences upon Public Works: Their Causes, Prevention, and ReparationNewman, John
Science
Earthwork Slips and Subsidences upon Public Works: Their Causes, Prevention, and Reparation
Newman, John
Earthwork
In pulling down walls that have been built with offsets at the back it
will usually be noticed that the filling does not rest upon them, but
that hollows occur as the earth subsides; for this reason, a straight
batter at the back is to be preferred. No support from the weight of the
earth, which is supposed to be upon them, should be relied upon,
although it may temporarily exist.
The filling should be commenced at the wall, and the layers be so
deposited that their slope approximates to that of being at right angles
to the surface of the slope of the ground rather than parallel to it.
When thought desirable and the natural ground is solid, it can be
benched, and the backing be damped and rammed.
The backing of a wall may consist not only of an inverted triangular
piece of earth, but extend for some distance to the rear, and may have a
top surface at a considerable height above it; the wall will then have
to sustain a severe thrust. The angle of repose of the earth should be
ascertained and the filling be thoroughly drained, or it may be
disintegrated by moisture, the whole mass gradually become unstable, and
finally push the wall forward with great force.
CHAPTER XII.
NOTES UPON SLIPS OF EARTH, SUBSIDENCES AND MOVEMENT IN FOUNDATIONS
CAUSED BY “BOILS” OR AN UPWARD RUSH OF WATER IN LOOSE
EARTHS.—CONSIDERATION OF SOME PRECAUTIONARY AND REMEDIAL OPERATIONS.
With regard to “boils” in sandy soils and the general drainage of the
site of dockworks, operations should be commenced as long as possible
before the works of construction, so as to lessen the probability of the
occurrence of slips, subsidences, and movement of earthwork. In order to
reduce infiltration, it is well to make a trench round the area of any
ground that has to be excavated, which may embrace the whole site. A
system of drains and conduits should be established within it, and at
the lowest level a sump at a convenient position, and to a depth a few
feet below that of the work; it can then be made the chief pumping
station of the dock; but all drawing away or flow of the earth must be
prevented: and to obviate erosion of the drains, they may require to be
rough lined with an impervious covering such as clay. The sump should
consist of an iron cylinder with proper provision against a run of soil.
In all loose earths the pumping station should be some distance from
buildings or roads so as to avoid any settlement.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account