Eclectic Magazine of Foreign Literature, Science, and Art, May 1885Various
History
Eclectic Magazine of Foreign Literature, Science, and Art, May 1885
Various
American literature -- Periodicals; Literature -- Periodicals
The Messrs. Siemens were also pioneers in submarine telegraphy, the
first cable covered with gutta-percha having been laid across the
Rhine by Dr. Werner Siemens in 1847. The invention of the machine for
coating the conducting wire with the insulating material, gutta-percha,
or india rubber, is entirely due to Dr. William Siemens, who also
subsequently designed the steamship _Faraday_ for the special work of
laying and repairing submarine cables. This unique vessel was launched
on Feb. 16, 1874, and when she was completed, Dr. Siemens invited
all his scientific friends to inspect her, and challenged them to
suggest any improvements in her arrangements. She was first used in
laying the Direct United States Cable, which is above 3,000 miles in
length. In this connection I may perhaps be permitted to relate a very
characteristic anecdote. When Dr. Siemens took a contract for a cable,
the electrical tests of which were specified, it was his invariable
habit to give out to the works a considerably higher test, which every
section of the cable had to pass, or be rejected _in toto_. In the case
of this cable, probably during manipulation on board ship, a minute
piece of wire penetrated the insulating material, bringing down the
electrical test to a point below the “works” test, but still decidedly
above the contract test. The discovery was not made until so late
that to cut out the faulty piece involved a delay of some days in the
middle of the Atlantic, but Dr. Siemens insisted upon its being done;
after this, stormy weather came on, and the cable had to be cut and
buoyed, while the _Faraday_ had to winter on the American side, and
resume operations next spring. The money loss involved amounted, I am
told, to more than £30,000. Perhaps the most remarkable of the later
feats was the fulfilment of a contract with the Compagnie Française
du Telegraphe de Paris à New York, who ordered a cable 3,000 miles
long from the Messrs. Siemens in March, 1879, and it was handed over
to them in perfect working order in September of the same year! There
are now nearly 90,000 miles of submarine cable at work, costing about
£32,000,000, and a fleet of thirty-two ships are employed in laying,
watching, and repairing these cables, of which there are now eleven
across the Atlantic alone.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account