_Methods of Dredging._--In river dredging two systems are pursued. One
plan consists in excavating a series of longitudinal furrows parallel to
the axis of the stream; the other in dredging cross furrows from side to
side of the river. It is found that inequalities are left between the
longitudinal furrows when that system is practised, which do not occur,
to the same extent, in side or cross dredging; and cross dredging leaves
a more uniform bottom. In either case the dredger is moored from the
head and stern by chains about 250 fathoms in length. These chains in
improved dredgers are wound round windlasses worked by the engine, so
that the vessel can be moved ahead or astern by simply throwing them
into or out of gear. In longitudinal dredging the vessel is worked
forward by the head chain, while the buckets are at the same time
performing the excavation, so that a longitudinal trench is made in the
bottom of the river. After proceeding a certain length, the dredger is
stopped and permitted to drop down and commence a new longitudinal
furrow, parallel to the first one. In cross dredging, on the other hand,
the vessel is supplied with four additional moorings, two on each side,
and these chains are, like the head and stern chains, wound round
barrels worked by steam power. In cross dredging we may suppose the
vessel to be moored at one side of the channel to be excavated. The
bucket frame is set in motion, but instead of the dredger being drawn
forward by the head chain, she is drawn across the river by the
starboard chains, and, having reached the extent of her work in that
direction, she is then drawn a few feet forward by the head chain, and
the bucket frame being still in motion the vessel is hauled across by
the port chains to the side whence she started. By means of this
transverse motion of the dredger a series of cross cuts is made; the
dredger takes out the whole excavation from side to side to a uniform
depth and leaves no protuberances such as are found to exist between the
furrows in longitudinal dredging, even when it is executed with great
care. The two systems will be understood by reference to fig. 1, where A
and B are the head and stern moorings, and C, D, E and F the side
moorings. The arc e f represents the course of the vessel in cross
dredging; while in longitudinal dredging, as already explained, she is
drawn forward towards A, and again dropped down to commence a new
longitudinal furrow.
[Illustration: Fig. 1.--Diagram showing Moorings for Transverse
Dredging.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account