Shore delivery has been successfully effected by raising the material by
buckets in the ordinary way and delivering it into a vertical cylinder
connected with floating jointed pipes through which the dredgings pass
to the shore. This, of course, can only be done where the place of
deposit is near the spot where the material is dredged. Two plans have
been satisfactorily employed for this operation. At the Amsterdam Canal
the stuff was discharged from the buckets into a vertical cylinder, and
after being mingled with water by a revolving Woodford pump was sent off
under a head of pressure of 4 or 5 ft. to the place of deposit in a
semi-fluid state through pipes made of timber, hooped with iron. These
wooden pipes were made in lengths of about 15 ft., connected with
leather joints, and floated on the surface of the water. A somewhat
similar process was also employed on the Suez Canal.
A dredger (Plate I. fig. 5), constructed by Messrs Hunter & English
for reclamation works on Lake Copais in Greece was fitted with
delivery belts running on rollers in steel lattice frames on each side
of the vessel supported by masts and ropes. It could deliver 100 cub.
metres per hour at 85 ft. from the centre of the dredger, at a cost of
1.82d. per cub. metre for working expenses, with coal at 45s. per ton,
including 0.66d. per cub. metre for renewal of belts, upon which the
wear and tear was heavy.
Another instance of the successful application of shore delivery
apparatus is that of a dredger for Lake Titicaca, Peru, constructed by
Messrs Hunter & English, which was fitted with long shoots on both
sides, conveying the dredged material about 100 ft. from the centre of
the dredger upon either side. The shoots were supported by shear-legs
and ropes, and were supplied with water from a centrifugal pump in the
engine room. This dredger could excavate and deliver 120 cub. yds. per
hour at a cost of 1.725d. per cub. yd. with coal costing 40s. per ton.
If coal had been available at the ordinary rate in England of 20s. per
ton, the cost of the dredging and delivery would have been 0.82d. per
cub. yd. for wages, coal, oil, &c., but not including the salary of
the superintendent.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account