Two of the largest and most successful instances of sand-pump dredgers
are the "Brancker" and the "G. B. Crow," belonging to the Mersey
Docks and Harbour Board. Mr A. G. Lyster gave particulars of the work
done by these dredgers in a paper read before the Engineering Congress
in 1899. They are each 320 ft. long, 47 ft. wide and 20.5 ft. deep,
the draught loaded being 16 ft. They are fitted with two centrifugal
pumps, each 6 ft. in diameter, with 36 in. suction and delivery pipes,
united into a 45 in. diameter pipe, hung by a ball and socket joint in
a trunnion, so as to work safely in a seaway when the waves are 10 ft.
high. The suction pipe is 76 ft. long and will dredge in 53 ft. of
water. The eight hoppers hold 3000 tons, equivalent when solid to 2000
cub. yds.; they can be filled in three-quarters of an hour and
discharged in five minutes. Mr Lyster stated that up to May 1899, the
quantity removed from bar and main-channel shoals amounted to
41,240,360 tons, giving a width of channel of 1500 ft. through the
bar, with a minimum depth of 27 ft. The cost of dredging on the bar by
the "G. B. Crow" during 1898, when 4,309,350 tons of material were
removed, was 0.61d. per ton for wages, supplies and repairs. These
figures include all direct working costs and a proportion of the
charge for actual superintendence, but no allowance for interest on
capital cost or depreciation. On an average, 20% of the sand and mud
that are raised escapes over the side of the vessel. Mr Lyster has,
however, to a considerable extent overcome this difficulty by a
special arrangement added to the hoppers (see _Proc. Inst. C.E._ vol.
188).
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account