The possibility of sudden strain necessitates a constant watching of
the dredge rope, as the ship's engines may at any moment be needed to
ease the tension by stopping the vessel's way, and the hauling engines
by paying out more rope. The use of accumulators both renders the
strain more gradual and gives warning of an increase or decrease;
indeed they can be calibrated and used as dynamometers to measure the
strain. One of the best forms of accumulator consists of a pile of
perforated rubber disks, which receive the strain and become
compressed in doing so. The arrangement is in essence as follows. The
disks form a column resting on a cross-bar or base, from which two
rods pass up one on each side of the column. Another cross-bar rests
on the top disk, and from it a rod passes freely down the centre
perforation of disks and base. Eyes are attached to the lower end of
this rod and to a yoke connecting the side rods at the top: a pull
exerted on these eyes is thus modified by the elasticity of the
dredge. In the "Porcupine" and other early expeditions the accumulator
was hung from the main yard arm, and the block through which the
dredge rope ran suspended from it. In more recent ships a special
derrick boom is rigged for this block, and a second accumulator is
sometimes inserted between the topping lift by which this is raised
and the end of the boom.
The margin of safety of steel wire rope is much larger than is that of
hempen rope, a fact of importance both in towing in a rough sea and in
hauling. Galvanized steel wire with a hempen core was first used by
Agassiz on the "Blake." He states that his wire weighed one pound per
fathom, against two pounds per fathom of hempen rope, and had a
breaking strain nearly twice that of hempen rope, which bore two tons.
Thus in hauling the wire rope has both greater capability and less
actual strain. It has also the advantages of occupying a mere fraction
(1/9) of the storage space needed for rope, of lasting much longer,
and its vibrations transmit much more rapid and minute indications of
the conduct of the dredge.
Wire rope is kept wound on reels supplied with efficient brakes to
check or stop its progress, and an engine is often fitted for winding
it in and veering it out. From the reel it passes to the drum of the
hauling engine, round which it takes some few turns; care is taken by
watching or by the use of an automatic regulator (Tanner) that it is
taken at a rate equal to that at which it is moving over the side.
From the hauling engine it passes over leading wheels (one of which
should preferably be a registering wheel and indicate the amount of
rope which has passed it), and so it reaches the end of the derrick
boom.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account