At length, on the 13th of August, 1841, Brunel descended the shaft at
Wapping, and entering a small cutting, passed through the shield in
the tunnel, amidst the cheers of the workmen. After all these years
of arduous toil, of anxious solicitude, and of hair-breadth escapes,
the end was near, and a passage under the Thames was cut. It was not
completed and open to the public, however, until the 25th of March,
1843, and then for foot passengers only.
The approaches for carriages remained to be constructed, and would have
been expensive works. They were to be immense circular roads, but they
were never made. Perhaps that deficiency contributed to the commercial
failure of the great engineering enterprise. In any case, the tunnel
never paid; the Company dissolved; and the tunnel passed over to the
East London Railway, who run trains through it. Its length is 1300
feet, while between it and the river there is a thickness of soil of
some fifteen feet.
Though a failure as a business, yet the tunnel was a great engineering
triumph. It was a marvel of perseverance, and of determined, arduous,
skilful toil against overwhelming difficulties. Eighteen years
passed before it was completed; and if the seven be deducted during
which the work was stopped, still eleven remain as the period of its
construction. Work occupying such a length of time must be costly.
Could it be shortened? Would tunnel-making machinery be developed and
improved so as to expedite the labour of years?
CHAPTER III.
THROUGH THE ALPS.
“Cut through the Alps? It is an impossibility; and it would never pay!”
“Yet they are about to do it. Sommeiller, an engineer, has invented, or
obtained, a rock-boring machine which promises to lighten the labour
considerably; and then, of course, they will shatter great quantities
of earth by explosives.”
“And what part of the Alps?”
“Through Mont Cenis. The tunnel will be about 7½ miles long, and the
mountain over it will rise 5400 feet at one point.”
“And when do they expect to finish it?”
“I cannot say. They will begin on the southern—that is, the
Italian—side first, and later on the French side. Through the tunnel
will pass one of the principal routes from the West to the East.”
This conversation, we may suppose, took place in 1857, the year when
the tunnel was commenced. For four years hand work was used, though
blasting was in operation from the first; but in 1861 drilling by
machinery was brought into play, and the rate of progress became much
greater.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account