The Mont Cenis Tunnel marks a transition period in tunnelling. During
the four years that hand labour was used, the average rate of progress
was but nine inches a-day on either side; but when the rock-drills
worked by compressed air were introduced, the speed was five times as
great. Still further, at the Arlberg Tunnel through the Tyrolese Alps
the average rate of progress was 9·07 yards per day, and the cost £108
per lineal yard; while the cost of the Mont Cenis was £226 per lineal
yard. These figures show immense progress in economy and in speed.
The St. Gotthard Tunnel was begun in 1872, and the machine drills were
used throughout. A heading was first cut about eight feet square, and
the hollow thus gained was afterwards enlarged and finally sunk to the
desired level. Several Ferroux drills were used, placed on a carriage,
and an average charge of 1¾ lbs. of dynamite placed in the holes made.
After firing, the compressed air was discharged and the shattered soil
was cleared away.
In the Arlberg Tunnel a chief heading was driven, and then shafts
opened up enabling smaller headings to be driven on both hands. Drills
worked by hydraulic power were used, as well as drills worked by air,
and, after the explosions, water spray was thrown out to assist in
clearing and purifying the air. Ventilators also were used, which
injected air at the rate of more than 8000 cubic feet per minute.
Speedy transit of the earth excavated and the materials for masonry
were also effected, it being estimated that some 900 tons of earth had
to be taken out of each end, and about 350 tons of masonry had to be
brought in, every day.
Tunnels through huge thicknesses of rock or under rivers can only
be cut from the two opposite ends. Where possible, however, other
shafts have been sunk along the line the subway was to take, and thus
excavation might continue at several places along the line of route,
the shafts being used for ventilation and for the conveyance of the
excavated soil.
But the use of machine drills and of blasting explosives, with improved
appliances for ventilation, have, with possibly some rare exceptions,
rendered these methods obsolete. According to Pliny the tunnel for
draining Lake Fucino was the greatest work of his day. It was over
3½ miles long, and cut under Monte Salviano. Forty shafts were sunk
in cutting it, also sloping galleries, and huge copper buckets were
used to carry away the earth. It is stated that this tunnel—some ten
feet high, by six wide—occupied 30,000 men eleven years. Compare this
with the Arlberg, or even the Gotthard, double and treble the length,
occupying much less time. Sir Benjamin Baker has calculated that the
Fucino tunnel could now be cut in eleven months.
Gunpowder gave some advance on old Roman methods of tunnelling. The
improved explosives and rock-drills have gone further.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account