English Cathedrals Illustrated: Second and Revised EditionBond, Francis
History
English Cathedrals Illustrated: Second and Revised Edition
Bond, Francis
Cathedrals -- England; Cathedrals -- Wales
VII. From 1235 to 1253 the see was occupied by a man of the highest
vigour and ability—Bishop Grosstête—who signalised his rule by many great
works. Luckily St. Hugh had been canonised in 1220, and money, no doubt,
flowed in abundantly from the pilgrims. But in 1239 the central tower
fell. It seems to have fallen to the south-east, and to have damaged
seriously the adjacent parts of the transept and choir, and in particular
the south side of the choir and the south-east transept. Everything else
had to be laid aside to get the mischief repaired. The repairs seem to
have been executed with the greatest haste and carelessness. The new
mouldings on the western side of the westernmost arches of the choir
did not fit the old, and a ring of stone was worked to hide the awkward
junction. Every arch in the south triforium is out of centre, and the
trefoils and quatrefoils are cut most clumsily. In the end bays of the
triforium of the choir and transept the central stalks “were replaced by
ugly moulded blocks resembling nothing so much as a pound of candles.”
The reconstructed arches may be recognised by having hood-moulds. The
canons wanted to get back into their choir as soon as possible, and may
well have regarded the whole affair as merely a makeshift till the nave
should be finished, and they could transfer their services to it, and
then pull down and rebuild St. Hugh’s choir more stably and in greater
height. In the south-east transept the inner wall of the tower was taken
down, and the upper part of the end wall was rebuilt. This work was done
more carefully, there being no need to hurry over it, as it did not
interfere with the use of the choir.
[Illustration: ANGEL TRIFORIUM.]
The canons could now resume their work in the nave. But their resources
had been heavily taxed by the unexpected demands made on them by the fall
of the central tower. They took counsel, unfortunately, with economy. The
original design had been, probably, to make the nave very much longer
than it is now, and then to build a brand-new west front, as at Wells and
Lichfield. The nave needs much greater length, being of the exceptional
breadth of forty-two feet. Now it was decided not to sweep away, but to
utilise the Norman west front and western towers as far as possible, and
to curtail the nave accordingly. Unfortunately, the new cathedral had not
been built at right angles to the Norman façade. The axis, therefore, of
the remaining bays of the nave had to deviate so as to strike the façade
as centrally as possible. Moreover, the western vault of the nave was too
lofty for the façade, so it was suddenly dropped two feet at the end of
the five eastern bays; and the distance between the completed bays and
the façade being insufficient for two arches of the span of the eastern
ones, the two western bays had to be built narrower than the rest. A
different vault, too, was built in the aisles of these two bays.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account