Building -- Estimates; Factories -- Design and construction; Hardware
=23. Floor Construction.=—The floor construction of the building
consists of 3" × 6" yellow-pine pieces, set on edge and spiked
together. Such a construction as this is available for spans between
girders of from 10 to 15 feet, and does away with all secondary
girders, or beams. It also has an advantage in that it presents a neat
ceiling beneath when the edges of the planks forming the rough flooring
are beveled. On the top of this rough flooring, which is designed for
carrying the floor load, and which is so constructed that the joints
in the different pieces are broken, a 1-inch or 1¼-inch maple flooring
is laid. Maple is used for finished floors in factories principally
on account of its hardness and the excellent wearing surface that it
affords. The maple flooring available in the market runs in lengths of
from 3 to 16 feet, but the cost of the floor is greatly increased if
a minimum length of 6 or 8 feet is specified. Usually the flooring is
tongued and grooved and hollowed on the back, as indicated in Fig. 8.
The hollow back prevents the flooring from curling. In a better class
of finished flooring, the pieces are end-joined, or provided with a
tongue and groove on the end. This prevents the end of the flooring
from turning up and interfering with the smoothness of the floor and
the operation of trucks over it.
[Illustration: FIG. 9]
=24. Waterproofing and Dust Proofing.=—For the purpose of deadening
sound, and sometimes for the sake of waterproofing, sheathing paper or
felt is inserted between the finished flooring and the rough plank. By
the introduction of paper between the maple and the rough flooring,
dust and dirt are prevented from falling through the crevices due to
the shrinkage of the flooring boards above.
It is usual in finishing a floor around the edge to use about 2-inch
quarter-round molding, as indicated at _c_, Fig. 7. This molding is
also used around the wooden columns, or posts.
In order to prevent the posts from splintering at the corner, and
so that there is less likelihood of the occupants being hurt, a
stop-chamfer, or arris, is formed on the corner.
=25. Splice Pieces.=—There is one feature which must not be overlooked
in mill construction, such as occurs in this figure, and that is that
since the girders butt against the columns on top of the post caps,
usually flush, there is nothing to carry the boards at _d_, therefore
yellow-pine pieces or steel angles must be provided, as indicated at
_e_. These splice pieces answer two purposes, namely, to form a bearing
for the ends of the planks _f, f, f_, and also to tie the girders
rigidly together longitudinally, and thus increase the rigidity of the
floor construction.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet