Building -- Estimates; Factories -- Design and construction; Hardware
Stone concrete, Table of cost of plain, §60, p19
Cost of ashlar and cut, §60, p26
Cost of soft, §60, p28
Cut, §61, p6
Dimension, §60, p24
Estimating the cost of ashlar or cut, §60, p28
masonry, §60, p24
Stonework, Calculating quantities for, §61, p4
Store-door locks, §55, p61
Strap and corner hinge plates, §55, p44
hinges, §55, p24
Strength of concrete columns, §64, p24
of reinforced-concrete columns, §64, p25
Structural steel, Cost of, §60, p69
Stucco work, Estimating, §60, p58
Studding, Partition, §61, p17
Wall, §61, p16
Studs and nails, Ornamental, §55, p125
Calculating number of, §60, p39
Styles and sizes of door knobs, §55, p73
Subtreasury locks, §55, p69
T
=T= hinges, §55, p25
Table of approximate cost of roof tiling per square, §60, p53
of approximate cost of slating per square, §60, p51
of cost of building per cubic foot, §60, p3
of cost of miscellaneous items of carpentry, §60, p45
Table of cost of plain gravel concrete, §60, p19
of cost of plain stone concrete, §60, p19
of cost of reinforced-concrete floor slabs, §60, p22
of cost of terra-cotta partitions, §60, p36
of cut-nail sizes, §55, p6
of data for estimating shingles, §60, p48
of height of chimneys, §64, p46
of labor cost of laying wooden floors, §60, p44
of labor prices per thousand brick, §60, p34
of number of slates per square, §60, p50
of panes of window glass per box, §60, p69
of quantities of material put in place per day by one man, §60, p43
of quantities of painting materials, §60, p74
of quantity of nails required for various purposes, §60, p46
of sash cord, §55, p81
of sash weights, §55, p19
of standard wire gauge, §55, p4
of wood screw sizes, §55, p13
Terra-cotta floor arches, Cost of, §60, p35
-cotta partitions, Table of cost of, §60, p36
-cotta window heads in factories, §64, p16
Tiling, Cost of, §60, p37
per square, Table of approximate cost of roof, §60, p53
Time locks, §55, p67
Toggle bolt, §55, p17
Toilet-room fixtures, §64, p12
-room partitions, §64, p11
rooms, Location of, §64, p10
Track construction for traveling cranes, §64, p39
Transom bolts, §55, p93
catches, §55, p93
chains, §55, p93
lifts, §55, p91
Traveling cranes, Planning for, §64, p37
cranes, Track construction for, §64, p39
Turnbuckles, §55, p131
Types of mill construction, §64, p13
U
Underflooring, Hemlock, §61, p19
Unit-cylinder locks, §55, p49
V
Vault lights, §55, p163
Ventilating system,
Estimating and calculating quantities for heating and, §61, p35
system, Estimating heating and, §60, p69
Verandas, Cost of, §60, p68
Volume of an excavation, Calculating the, §60, p16
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account