Stephenson himself was one of the busiest men in the kingdom. He was
engineer of half a dozen lines that were building, and he traveled
incessantly. Many nights the only sleep he had was while sitting in
his chaise riding over country roads. At dawn he would be at work,
surveying, planning, directing, until nightfall. In three years he
surveyed and directed the construction of the North Midland line,
running from Derby to Leeds, the York and North Midland, from
Normanton to York, the Manchester and Leeds, the Birmingham and Derby,
and the Sheffield and Rotherham. And in addition to this he traveled
far and wide to give advice about distant lines, to the south of
England, to Scotland, and to the north of Ireland to inspect the
proposed Ulster Railway. He took an office in London, in order that he
might take part in the railway discussions that were continually
coming before Parliament. His knowledge of every detail relating to
the subject was enormous. He knew both the engineering and the
business sides most intimately. “In fact,” he said to a committee of
the House of Commons in 1841, “there is hardly a railway in England
that I have not had to do with.” Yet in spite of all this work he
found time to look after his coal mines near Chesterfield, to
establish lime-works at Ambergate, on the Midland Railway, and to
superintend his flourishing locomotive factory at Newcastle.
King Leopold of Belgium invited him to Brussels, and there discussed
with him his plans for a railway from Brussels to Ghent. The King made
him a Knight of his Order of Leopold, and when the railway was
finished George Stephenson was one of the chief guests of honor at the
opening. Later he went to France, where he was consulted in regard to
the new line that was building between Orleans and Tours. From there
he went to Spain to look into the possible construction of a road
between Madrid and the Bay of Biscay. He found the government of
Spain indifferent to the railway, and there were many doubts as to
whether there would be sufficient traffic to pay the cost of
construction. His report to the shareholders in this proposed “Royal
North of Spain Railway” was therefore unfavorable, and the idea was
shortly after abandoned.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account