History for ready reference, Volume 6 : $b Recent history - 1894-5 to 1901 A-ZLarned, J. N. (Josephus Nelson)
History
History for ready reference, Volume 6 : $b Recent history - 1894-5 to 1901 A-Z
Larned, J. N. (Josephus Nelson)
History -- Dictionaries
The municipal election of April 4, 1899, in Chicago, resulted
in the reelection of Mayor Carter H. Harrison, Democrat, by
149,000 votes, against 107,000 cast for Zina R. Carter,
Republican, and 46,000 for Ex-Governor Altgeld, radical
Democrat, running independently. In the opinion of a
correspondent of the "Review of Reviews," "The campaign
disclosed three interesting results—namely: (1) the growth of
independence and of attention to local issues; (2) the
dominance of the street-railroad issue; and (3) the growth of
sentiment in favor of municipal ownership. Nearly two-thirds
of all the votes cast were against the Republican candidate,
and our correspondent regards this as largely due to the
belief that he, more than any of the others, represented the
interests of the street-railroad corporations." This writer
holds that "in all probability any practical proposition for
municipal ownership and operation of the street-railroads
would to-day be approved by a popular vote in Chicago."
{75}
CHICAGO: A. D. 1900.
Opening of the Drainage Canal.
An extraordinary public work was brought into use early in the
year, by the opening of what is known as the Chicago Drainage
Canal. This was constructed for the purpose of turning the
natural flow of water in Chicago River backward, away from
Lake Michigan, its natural embouchure, into the small Des
Plaines River, which runs to the Illinois, and the Illinois to
the Mississippi,—the object being to carry the sewage of
Chicago away from the Lake, where it contaminates the water
supply of the city. Part of the city sewage was already being
sent in that direction by a pumping system which carried it
over the divide; the purpose of the canal is to take the
whole. The work was begun in September, 1892, and practically
finished, so far as concerns the canal, in little more than
seven years, at a cost of about $34,500,000. Changes in the
city sewage system, to fully utilize the object of the canal,
were still to be completed. When the full use is realized,
there is said to be provision in the canal for a maximum
discharge of 600,000 cubic feet of water per minute. Some have
anticipated that such an outflow would seriously lower the
level of the lakes; but there were no signs of that effect in
the season of 1900. Nor did it seem to appear that the sewage
then passing by river flow westward was doing harm to towns on
the Illinois and Mississippi, as they had apprehended; but the
discharge was, as yet, far short of what it is intended to be.
It is possible that ultimately the Chicago Drainage Canal may
become part of a navigable water-way from the lakes to the
Mississippi, realizing an old project of water transportation
in that direction to compete with the rails. The canal has
been constructed upon a scale to suffice for that use; but the
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account