History of the U.S.S. Leviathan, cruiser and transport forces, United States Atlantic fleet: Compiled from the ship's log and data gathered by the history committee on board the shipU.S.S. Leviathan History Committee
History
History of the U.S.S. Leviathan, cruiser and transport forces, United States Atlantic fleet: Compiled from the ship's log and data gathered by the history committee on board the ship
U.S.S. Leviathan History Committee
Leviathan (Steamship); Vaterland (Steamship); World War, 1914-1918 -- Naval operations, American
Our second target practice was held June 5, 1918, while on our way from
Brest, France, to New York. Spotters who had had no previous experience
at actual spotting were picked to control the gun fire and made an
excellent showing.
SCORE
Shots fired, 38; hits made, 28; percentage of hits, 70.62. Gunnery
Officer, Lieut. A. H. Bateman, U. S. N.; Chief Umpire, Lieut. R. H.
Jones, U. S. N.
The third and last practice was held on our way from New York to Brest,
France, on October 4, 1918. We had unfavorable conditions as to weather
and visibility. A high wind and a large swell on the starboard quarter
rendered the ship a most unsuitable gun platform. The speed was twenty
knots. However, it proved valuable because of the difficulties to contend
with. In this practice, as in the second practice, new spotters were put
in control of guns in order to gain experience.
SCORE
Shots fired, 32; hits made, 18; percentage of hits, 51.66. Gunnery
Officer, Lieut. A. H. Bateman, U. S. N.; Chief Umpire, Lieut. R. H.
Jones, U. S. N.
SUBMARINE ATTACKS
The submarine attacks and alarms are described in detail in Part II of
this book. See the following dates: May 6, 1918; May 30, 1918; June 1,
1918; June 25, 1918; September 2, 1918; October 31, 1918.
F. I. Collup, Chief Gunner’s Mate, U. S. N.
_The Electric Plant_
W. S.
Lieutenant W. H. F. Schluter reported for duty July 29, 1917. The
electrical plant at that date was in charge of Mr. Joe. O’Donnell, head
electrician, Navy Yard, New York. The civilian force were scattered over
the ship, tracing out and locating circuits. This was a most difficult
procedure because there were absolutely no plans of circuits nor any
descriptive matter of electrical apparatus.
On August 13, 1917, the first Navy electrician reported for duty and a
few days later more reported. As soon as enough electricians reported,
the civilian electricians were relieved from dynamo watch. Next the
entire communication, lighting and power details were taken over by the
Navy electricians, both regular and reserve.
When these details were arranged the Navy Yard electricians were relieved
from the maintenance of the plant and attended to new installation and
repair work only. It was at this point where actual headway was made in
preparing the plant for sea, for under the former arrangement the Navy
Yard electricians could not devote their entire time to repair work and
new installation without being called off their job every little while.
The co-operation between the civilian and enlisted electricians was
splendid and too much credit cannot be given to these two classes of men.
It was fine to see the spirit that prevailed, for both were anxious to
get the ship ready for sea. To say that this called for good hard work,
hour after hour and day after day, is putting it mildly.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account