History of the U.S.S. Leviathan, cruiser and transport forces, United States Atlantic fleet: Compiled from the ship's log and data gathered by the history committee on board the shipU.S.S. Leviathan History Committee
History
History of the U.S.S. Leviathan, cruiser and transport forces, United States Atlantic fleet: Compiled from the ship's log and data gathered by the history committee on board the ship
U.S.S. Leviathan History Committee
Leviathan (Steamship); Vaterland (Steamship); World War, 1914-1918 -- Naval operations, American
We experienced a great deal of trouble with the side brick walls of the
furnaces the first two trips, which required the renewal of about 4,000
bricks each voyage. On being notified that we would be required to start
making quick turn-arounds on the next voyage, I realized that this could
not be done with such an amount of brick work to be repaired. After many
conferences while at sea, we finally decided to tear all the brick work
out of one boiler and substitute cast iron liners, shaped to fit the
drums and punched with holes for ventilation. This idea proved highly
successful. All boilers were immediately fitted likewise and all operated
successfully. Besides the elimination of the expense for the purchase of
bricks and cement, the labor and time of cleaning furnaces was reduced
ninety per cent. All that is necessary for cleaning and repairing furnace
walls at the present time is one man and a corn broom.
The steaming efficiency has been greatly hampered at all times by the
flow of water over the fire room floor plates, due to the faulty design
of the German ash ejector. After many attempts to remedy this by altering
the design, we were finally compelled to replace the hoppers with new
hoppers of the See type.
There was at all times a great deal of trouble experienced in carrying
over water from the boilers to the turbines. The water in the boilers
was carried at the lowest level consistent with safety, but in spite of
this the trouble still continued. On inspection of the main steam lines
and boiler steam drums it was found that they were practically bare of
lagging. All these lines and drums were immediately covered with two-inch
of magnesia eighty-five per cent pure, and all water trouble was then
eliminated. The water level in the boilers was also raised from two to
four inches, thus giving a greater factor of safety here.
After several trips we noticed that the uptakes were excessively hot and
also that at times torching occurred at the stack tops. This being a
menace to the safety of the ship in the war zone, it had to be remedied.
After examining the uptake, furnaces and path of gases we decided to
alter the baffling. This was done by installing flame baffles at the base
of the uptake in each boiler. It not only eliminated the torching, but
also decreased the amount of soot formation about fifty per cent.
This includes all the major items of the fire rooms. A few general items
follow:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet