The rain-gathering potential of the New Territories had been exploited
by the 1930s with the construction of the Shek Li Pui and the Jubilee
Reservoirs. When the Japanese arrived, they found 13 reservoirs with a
storage capacity of 6 billion gallons. They let the mains deteriorate
during their occupation of the colony, applying their own brand of
water-rationing by cutting off all supply to entire sections of the
colony whenever they chose to.
Following World War II, the government tried deep boring to reach
underground water resources, but this turned out to be scarcely worth
the effort. After years of surveying and study, engineers laid out the
Tai Lam Chung Reservoir System, at the central western end of the New
Territories. This called for construction of a two-section dam 2,300
feet long and 200 feet high. This gigantic main dam, built entirely
of concrete, created a reservoir of 4 billion, 500 million gallons.
Twenty-three miles of “catchwaters,” or concrete channels to trap run-off
from the rains, funneled the surface water from 11,000 acres into the
reservoir. It took eight years to construct, being completed in 1960 at a
cost of almost $25 million.
None of these large dams served the needs of the hundreds of small
villages in the New Territories, which still relied on wells and streams
or threw up earth dams in hilly areas to form their own miniature
reservoirs. After World War II the colony government and the Kadoorie
Agricultural Aid Association, a private philanthropic body, furnished
grants of cement to replace these crude and leaky installations with
concrete dams and concrete-lined wells, plus pipes to carry the water
into the villages.
Rice crops in the New Territories were dependent on their own irrigation
systems, traditionally constructed of earth channels and dams. They were
laid out with evident shrewdness to cover the greatest possible area,
but the dams and channels had to be nursed along constantly to prevent
leaking and to keep them from becoming choked with weeds. The government
and the Kadoorie Association also furnished materials to replace these
systems with concrete dams and channels. Nearly 600 dams and more than
220,000 feet of channels have been improved in this way since World War
II.
When the Tai Lam Chung Reservoir was under construction, a very delicate
balance of catchwaters and irrigation channels had to be worked out so
that the reservoir collected all the excess summer rain not required for
irrigation, but did not draw off the sparse winter rains which farmers
had to have. The farmers’ initial assumption when they saw the huge
catchwater channels passing the farms on their way to the reservoir was
that they were being robbed of water; it took considerable diplomacy and
convincing proof to allay their suspicions.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account