In making the foundation for a house, the ground should be excavated,
so as to secure a solid bed of earth or rock not liable to be affected
by the weather. A continuous bed of the best cement concrete should
then be laid, not only under the walls, but covering the entire site
of the house, and extending on every side at least 6 inches beyond the
footings of the wall; and for footings it should never be less than 18
inches thick. The concrete serves two purposes: it, to a large extent,
cuts off the entrance of the ground-air through the basement floor
into the house; and prevents the entrance of damp into the house from
below. To further ensure dryness where the floor is below the level of
the adjacent ground, a _dry area_ is frequently provided, that is, a
closed chamber lined with stone or cement below the ground level of
the house, and surrounding the underground part of its four walls, or
a hollow wall is built below the ground-level, as shown in Fig. 38.
Neither a dry area nor a hollow wall constitutes the best arrangement,
as the cavity is usually inaccessible, and rather aids than hinders the
entry of the ground air into the house. The best plan is to provide a
solid wall, impervious to both moisture and air. A vertical layer of
roofing slates is sometimes used for this purpose; or, still better, a
narrow cavity about 1∕2 to 3∕4-inch wide is provided in the body of the
wall, and this is run full with molten asphalte.
The =Walls= of the house must be provided with a “=_damp-proof
course_=” carried through their whole thickness, slightly above the
highest point at which the ground is touched. It may be formed by (1)
sheet lead, which possesses the disadvantage of being costly; (2) two
layers of ordinary roofing slate, set in cement, with broken joints,”
_i.e._ the joints of the upper layer over the centre of the slates
below them; (3) a layer of good asphalte, about ¾-inch thick; (4)
perforated glazed stoneware slabs; or (5) two or three courses of hard
blue Staffordshire bricks, laid without mortar. The use of asphalte is
an excellent plan, and is now commonly adopted in good buildings.
[Illustration: FIG. 38.
DOUBLE DAMP-PROOF COURSE AND HOLLOW WALL.
_a_, _a_—Damp-proof courses. _b_—Level of neighbouring ground.
_c_—Floor-boards. _d_—Floor joist. _f_—Vertical space in wall.
_g_—Concrete under foundation and over site of house.]
This suffices when there is no basement. If there is a basement an open
area around the house is desirable. Where for a given wall this cannot
be secured, the vertical damp-proof course already described must be
made to extend from the foundations well above the ground level. The
open area, however, should be insisted on whenever practicable. The
damp-proof course protects the walls from damp proceeding from the soil
around or beneath the house.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account