Infantry Drill Regulations, United States Army, 1911: Corrected to April 15, 1917 (Changes Nos. 1 to 19)United States. War Department
History
Infantry Drill Regulations, United States Army, 1911: Corrected to April 15, 1917 (Changes Nos. 1 to 19)
United States. War Department
United States. Army. Infantry -- Drill and tactics
580. The detail of a support is not necessary except when the
artillery is separated from the main body or occupies a position in
which its flanks are not protected.
The detail of a special support will be avoided whenever possible.
581. The formation of an artillery support depends upon circumstances.
On the march it may often be necessary to provide advance, flank, and
rear protection. The country must be thoroughly reconnoitered by
patrols within long rifle range.
582. In action, the formation and location of the support must be such
as to gain and give timely information of the enemy's approach and to
offer actual resistance to the enemy beyond effective rifle range of
the artillery's flanks. It should not be close enough to the artillery
to suffer from fire directed at the artillery. In most cases a
position somewhat to the flank and rear best fulfills these
conditions.
583. The support commander is charged only with the protection of the
artillery. The tactical employment of each arm rests with its
commander. The two should cooperate.
_INTRENCHMENTS._
(Plate V.)
584. Ordinarily, infantry intrenches itself whenever it is compelled
to halt for a considerable time in the presence of the enemy.
Infantry charged with a resisting mission should intrench whenever
there is any likelihood that the cover constructed will be of use.
585. Except in permanent fortifications or in fortifications prepared
long in advance, the infantry plans and constructs the field works
that it will occupy.
When performing their duties in this connection officers should bear
in mind that profile and construction are simple matters compared with
location and correct tactical use.
586. Intrenchments enable the commander to hold a position with the
least possible number of men and to prolong his line or increase his
reserve.
They are constructed with a view to giving cover which will diminish
losses, but they must not be so built or placed as to interfere with
the free use of the rifle. Fire effect is the first consideration.
587. The trace of a fire trench or of a system of fire trenches
depends upon the ground and the proposed density of the entire firing
line. The trenches are laid out in company lengths, if possible.
Adjoining trenches should afford each other mutual support. The flanks
and important gaps in the line should be protected by fire trenches
echeloned in rear. (Fig. 6).
588. To locate the trace, lie on the ground at intervals and select
the best field of fire consistent with the requirements of the
situation.
A profile should be selected which will permit the fire to sweep the
foreground, require the minimum of labor and time, and permit the best
concealment. No fixed type can be prescribed. The type must be
selected with due regard to the terrain, the enemy, time, tools,
materials, soil, etc.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account