Along a main canal and its branches there is nearly always a “canal dak”
or system of conveyance of bags containing correspondence for the
officials stationed on the canal or touring along it. Along the main
line, and most of the way down the branches, there is a line of
telegraph for the special use of the canal officials. The telegraph
offices are at the chief regulators, with tapping stations, for the use
of officials on tour, at the rest houses near to which the line runs.
However carefully a canal has been designed, alterations in the channels
from silting and scour soon take place and they go on more or less
without cessation. In a distributary, especially if the gradient has of
necessity been made somewhat flat, there is quite likely to be a deposit
in the upper reach. The deposit is generally greatest at the head and
decreases, in going downstream, at a fairly uniform rate. It may extend
for half-a-mile or less or more. Or a deposit may occur on the sides,
which grow out and contract the channel. This often occurs over a great
length of a distributary or even over the whole of it. Sometimes a
distributary scours its bed, or the sides may fall in somewhat.
Clearances of the silt and cutting of the berms are effected at
intervals. Falling in of the sides may be stopped by means of bushing,
and scour of the bed may be stopped by raising the crest of a fall or by
introducing a weir, but in the meantime the changes cause the discharge
tables for the distributary to become more or less erroneous. In many
cases silt deposits in the upper part of the distributary during the
summer months when the river water is heavily silted and scours away
again in the winter, the régime of the channel being, on the whole,
permanent. The changes which occur in the branches and main canal are
similar to the above and the remedies adopted are similar. On some of
the older canals the scour was so serious that many intermediate weirs
had to be constructed. The remarkable silting in the head reach of the
Sirhind Canal has been described in _River and Canal Engineering_,
Chapter V. The remedy consisted in keeping the gates of the
under-sluices properly closed so that a pond was formed in which the
river silt deposited. When necessary the canal is closed, the sluices
opened, and the silt scoured away. For a plan of the headworks see fig.
24.
In working a canal, it is necessary to arrange so that the water sent
down any channel is as nearly as possible in accordance with the demand.
The zilladar supplies the Subdivisional Officer, every week or ten days,
with an “indent” showing how much water is required in each distributary
and the Subdivisional Officer makes indents on the subdivision next
above. The officer in charge of the headworks thus knows what the demand
is. When it is more than the supply available, the water is dealt out to
the various divisions according to rules approved of by the
Superintending Engineer of the canal.
[Illustration: FIG. 24.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account