When the crop in any field or part of a field fails to come to maturity,
the water rate on it is remitted. The failed area is known, in the
Punjab, as “kharába.” On some canals the failed areas are liable to be
large and an irrigation register, in order to be complete, has to show
them or, what is the same thing, to show both the gross and the net
areas, the latter being the area left after deducting the kharába or
remitted area.
2. =Gauges and Regulation.=--In every canal, branch and major or minor
distributary there is a “head gauge” below the head regulator. At every
double regulator there is a gauge in each branch and also an upstream
gauge. These gauges are used for the regulation of the supply. The zeros
of the gauges are at the bed levels. Tables are prepared showing the
discharges corresponding to each gauge reading--except in the case of
upstream gauges--at intervals of ·1 foot.
The question often arises whether it is necessary to have a gauge near
the tail of a distributary. If the outlets have not been properly
adjusted and if water does not reach the tail in proper quantity, a tail
gauge is absolutely essential and its readings should be carefully
watched by the Sub-divisional Officer. To take no action until
complaints arise or until the irrigation returns at the end of the crop
show that some one has suffered, is not correct. When it is known that
sufficient water always reaches the tail, a tail gauge is not necessary.
There may be intermediate gauges on a canal or branch or distributary.
For convenience of reading they are usually at places where a
distributary or minor takes off or where there is a rest house. They
serve to show whether the water level at that place alters while that
at other places is stationary, and thus give indications of any changes
occurring in the channel. The number of such intermediate gauges should
be rigorously kept down. In fact hardly any are necessary. The gauge
register which the Subdivisional Officer has to inspect daily, is, in
any case, voluminous enough.
At a double regulator it is never necessary, except as a very temporary
arrangement in case of an accident, to partially close both channels at
once. One or the other should be fully open. The upstream gauge reading
shows whether this rule is being adhered to. If the bed levels of all
three channels at the regulator are the same, the reading on one or
other of the downstream gauges should be about the same--for the fall in
the water passing through an open regulator is generally negligible--as
that of the upstream gauge. In other cases the difference in the bed
levels has to be taken into account.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account