Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvementsBellasis, E. S. (Edward Skelton)
Science
Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvements
Bellasis, E. S. (Edward Skelton)
Canals; Irrigation
The regulation should usually be so effected that rushes of water in any
portion of the channel are avoided, but if scour occurs in a particular
part of the channel it may be necessary to try and obtain slack water
there. Until it is proved by experience that they are unnecessary,
soundings should be taken periodically downstream of large works. When a
branch or escape is closed the leakage should be carefully stopped. The
necessary materials should be always kept ready in sufficient quantity.
3. =Gauge Readings and Discharges.= For the head gauge of each
distributary and for certain gauges in the canals, discharge tables,
based on actual observations, are prepared. If changes occur in the
upper part of a channel, the discharge corresponding to a given gauge
reading is altered. One remedy for this is to have a second gauge
downstream of the “silt wedge” or scoured or narrowed reach. The indents
are then made out with reference to the second gauge, but any slight
adjustments due to fluctuation in the water level of the canal, are
effected by means of the head gauge. Unless the zilladar and
Subdivisional Officer are on the alert, the gauge reader is likely to
evade going to the lower gauge every morning, and to enter fictitious
readings for it, inferring them from the readings of the head gauge. If
there are any outlets between the two gauges, their discharge has to be
observed or estimated and added to the discharge of the distributary as
entered in the table corresponding to the readings on the second gauge.
The above system can be worked with advantage in cases where the
distributary bifurcates two or three miles from its off-take. The men in
charge of the two regulators can work together, one of them or an
assistant, going daily from one regulator to the other and back.
Usually, however, the vitiating of the discharge table at the head gauge
has to be faced, and the table to be constantly corrected. It is
impossible to frame beforehand any rule or formula which would give a
certain correction for a certain depth of silt deposit. Moreover, there
might or might not be a contraction of the channel due to deposit on the
sides. The usual plan is to observe a discharge some time during each
month. If the result is in excess of the tabular discharge, all the
discharges for that month are increased in the same proportion. They can
be booked according to the table and totalled, and the correction
applied to the total.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account