Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvementsBellasis, E. S. (Edward Skelton)
Science
Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvements
Bellasis, E. S. (Edward Skelton)
Canals; Irrigation
The same principle can be adopted for any distributary whose off-take is
in the upper part of a branch, _i.e._, where the branch is many times
larger than the distributary, and where it is not possible or not
desirable to regulate the water level of the branch. For a distributary
further down the branch, the turns of branch and distributary can be
arranged as explained above for a canal bifurcation. The orders given to
the gauge reader are, as before, to give the channel whose turn it is,
full supply and to send the balance down the other channel. When the
turn of distributary is over it becomes the turn of the branch. The
distributary would not be closed if this would cause the full supply in
the branch to be exceeded. Care must be taken that every distributary
receives full supply during part of the time when the branch is
receiving full supply. If its turn came only when the branch was
receiving a residuum supply, or rather when the residuum supply was
reaching the distributary off-take--for in the case of a distributary
whose off-take is far down a long branch the two things are not the
same--it might, in the event of the supply in the main canal falling
exceptionally low, receive no water at all.
The time taken by a rise in travelling down a canal is very much the
same as that taken by a fall and each takes effect more or less
gradually. When a branch receives, at any point, a temporary increase in
its supply, owing to the closure of a distributary for, say, three
days, there will be a rise lasting for three days at a point further
down. The rise will take some time to come to its height, and some time
to die away. There will be about three days from the commencement of the
rise to the commencement of the fall, or from the end of the rise to the
end of the fall. If, either in the main canal or in a branch, there is
any distributary into which full supply cannot be got, its turn can be
increased accordingly. Owing to the shortness of the turns, and to
allowance having to be made for the time occupied by rises and falls in
travelling down the branch, the fixing of the turns for distributaries
near the tail of the branch requires a good deal of consideration.
Matters are facilitated by making a sketch (Fig. 25) in which the widths
of the channels, as drawn, are roughly in proportion to the full supply
discharges. If 14 copies of the sketch are made the arrangements for
each day can be shown on them, full supply being shown black and
residuum hatched. Distributaries would be shown as well as the main
channels.
[Illustration: FIG. 25.]
The irrigation registers of course show how the irrigation of the
different channels is going on from year to year and if changes in the
turns become necessary they can be effected.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account