Regarding the alterations in sizes of outlets, whether or not there are
alterations in their number and position, information as to the actual
duties on the watercourses should be obtained. The discharge of the
watercourses should be observed several times and added up and checked
with the discharge of the distributary. The areas irrigated are known
from the irrigation register. If the duties are abnormal the causes can
be gone into, and a judgement can be formed as to how far they will
remain in existence, and whether any watercourse is often kept closed.
If so the outlet is too large. The duties, modified so far as may seem
desirable, can be used for calculating the sizes of the remodelled
outlets. But alterations of the sizes after a year or two years’ working
will probably be necessary. The above procedure is also applicable to a
case where the old watercourses had no masonry heads but were merely
open cuts as on some inundation canals.
A common case is that in which the channel is not remodelled--or at
least its water level remains very much as before--but merely the
outlets are altered in number, position or size, or in any or all of
these. If the land irrigated by an outlet is high, the irrigation may be
far short of what was expected, and the size of the outlet may have to
be increased or its site shifted, generally upstream. This is often done
at the request of the people, and at their expense.[36]
[36] On some of the more modern canals the people are not allowed to
pay for outlets, so that no question of ownership can arise.
Old outlets should always be removed when superseded by others.
Otherwise they are apt to be reopened or claims set up regarding them.
Near the tail of a channel the discharge of an outlet may be an
appreciable fraction of that of the channel. In such a case the
adjustment of the size of the outlet, and that of the channel or of any
weir or fall in the channel, should be considered together, the
irrigation on the outlet and that on the channel downstream of it being
compared. And similarly as to the sizes of any two or more tail outlets.
Such outlets are sometimes left without masonry heads on the ground that
this injures no one. It may injure an outlet upstream of them by drawing
down the water. Tail outlets often need constructing or reducing in size
to raise the water level in the reach upstream of them.
Whenever the size of an old outlet is altered the design should be
altered if unsuitable. The parapets should be brought into proper line,
the roadway corrected, the floor level adjusted and any splayed wing
walls abolished. If the outlet is skew it should be made square. All
this should also be done to all old outlets or heads of minors even if
the sizes are correct, whenever remodelling of outlets on any channel is
undertaken.[37]
[37] Wherever an outlet is built or altered, a template, made to the
exact size of barrel required, should be supplied to the subordinate
in charge of the work.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account